Simple Solar
MCS certified solar PV, battery storage and EV charger specialists based in Plymouth with 500+ installations across the South West
11+
Years in Business
500+
Projects Completed
42
Customer Reviews
100 km
Service Area
11-50
Employees
SurgePV Score
About Simple Solar
Simple Solar is a Plymouth-based solar energy company founded by Dan Barnes and Ben Quick, operating from Unit 1a Foley Lodge, Chittleburn Business Park, Brixton, Plymouth, Devon, PL8 2PH. The company has been installing solar panels across the South West for over ten years and has surpassed 500 installations across homes and businesses in Devon, Cornwall, Somerset, and Dorset.
The company holds MCS, NICEIC, RECC, CHAS, and TrustMark accreditations, making it one of the most fully certified solar installers in the Plymouth area. This ensures every installation is eligible for the UK Smart Export Guarantee and meets all quality and safety standards. Simple Solar designs and installs solar PV systems, battery storage, and EV chargers for residential and commercial customers.
The founders bring backgrounds in engineering and renewables, and have built the company on a straightforward principle: make solar simple, honest, and accessible. Their team handles the entire process — initial survey, system design, installation, commissioning, and aftercare — using only qualified in-house engineers. The business has grown to serve clients across Somerset and Dorset in addition to its core Devon and Cornwall market.
Customer reviews consistently highlight Simple Solar’s clear communication, tidy workmanship, and practical handover — including battery setup guidance and minor remedial roofing work where needed. Reviewers report significant reductions in energy bills following installation.
Service Area
Simple Solar serves the following areas within a 100 km radius:
Contact Information
Are you Simple Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
5
42 reviews
Verified Customer
Simple Solar gave me clear options, listened to what I wanted, and the install was tidy. They even replaced some damaged roof slates and showed me how to set up and manage the batteries.
Verified Customer
The process was simple from start to finish, everything ran smoothly and the end result is fantastic! I couldn't believe how much my energy bill dropped in just the first month.
Verified Customer
Highly recommend Simple Solar for their quality of service, knowledge, and reliable support throughout the process. Very happy!
Frequently Asked Questions About Simple Solar
What services does Simple Solar offer?
Simple Solar offers Solar Installation, Battery Storage, EV Charging.
Is Simple Solar MCS certified?
Yes, Simple Solar is MCS certified and also holds NICEIC, RECC, CHAS, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Simple Solar serve?
Simple Solar serves Plymouth, Devon, Cornwall, Somerset, Dorset. They are based in Plymouth with a service radius of 100 km.
What warranty does Simple Solar offer?
Simple Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Simple Solar's customer reviews?
Simple Solar has a 5/5 rating based on 42 customer reviews. Customers consistently rate them highly.
How long has Simple Solar been in business?
Simple Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Plymouth
Get a Free Solar Quote from Simple Solar
Fill in your details and we'll connect you with Simple Solar.
Quote request sent!
Simple Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile