E

Ecocetera

One of Bristol's first MCS-accredited solar installers — quality PV and battery storage since 2001

Bristol, UK
5 (28 reviews)
Verified
Residential Commercial

25+

Years in Business

28

Customer Reviews

50 km

Service Area

SurgePV Score

8.6 / 10
Customer Reviews
100%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
70%
Online Presence
50%

About Ecocetera

Ecocetera is a Bristol-based solar PV installer located at 35 Southdown Road, Westbury-on-Trym, Bristol BS9 3NJ. The company has been operating for over 24 years and was one of the very first renewable energy businesses in the UK to achieve MCS accreditation, earning the certification in 2009. Ecocetera is also an NICEIC Approved Contractor, allowing the team to sign off all work with Building Control directly.

The company installs solar PV for homes and businesses across Bristol and surrounding areas, and also provides battery storage solutions, smart switches, and ongoing maintenance and service for solar PV systems. Ecocetera selects panels based on performance, build quality, and the ethical standards of the manufacturer, working with brands including Canadian Solar panels and Anker Solix inverter and battery systems.

On FreeIndex, Ecocetera holds a 5.0-star rating from 28 reviews, with all reviewers awarding the company five stars. The company also has 12 reviews on Trustpilot. Customers consistently praise the team’s technical knowledge, quality of installations, competitive pricing, and the personal, community-focused approach that comes from being a long-established local business.

Service Area

Ecocetera serves the following areas within a 50 km radius:

BristolBathNorth Somerset

Are you Ecocetera?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

MCS NICEIC

Partner Manufacturers

Panels

Canadian Solar

Inverters

Anker Solix

Batteries

Anker Solix

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

28 reviews

Verified Customer

15 June 2025
Verified Customer

Every aspect from the information and administration to the installation itself was carried out with total professionalism and efficiency by the very friendly, helpful and polite team.

Verified Customer

10 March 2025
Verified Customer

Of the three installers I compared, Ecocetera was by far and away the most knowledgeable in terms of the technology, and prided themselves particularly on the quality of their installs.

Verified Customer

5 December 2024
Verified Customer

The actual installation of the PV panels, inverter, and all new cabling were done in two days by experienced staff who were polite, tidy, informative, trustworthy and helpful at all times.

Frequently Asked Questions About Ecocetera

What services does Ecocetera offer?

Ecocetera offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Ecocetera MCS certified?

Yes, Ecocetera is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Ecocetera serve?

Ecocetera serves Bristol, Bath, North Somerset. They are based in Bristol with a service radius of 50 km.

What warranty does Ecocetera offer?

Ecocetera offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Ecocetera's customer reviews?

Ecocetera has a 5/5 rating based on 28 customer reviews. Customers consistently rate them highly.

How long has Ecocetera been in business?

Ecocetera was founded in 2001 and has been in business for 25 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Ecocetera

Fill in your details and we'll connect you with Ecocetera.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote