JS

JTD Solar

Bristol-based solar PV, battery storage, and EV charge point specialists with 5-star Google reviews

Bristol, UK
5 (70 reviews)
Verified
Residential Commercial

2+

Years in Business

70

Customer Reviews

60 km

Service Area

SurgePV Score

8.1 / 10
Customer Reviews
100%
Certifications
90%
Experience
50%
Services Range
75%
Warranty Coverage
70%
Online Presence
100%

About JTD Solar

JTD Solar is a Bristol-based renewable energy installer located at 32 Equinox South, Great Park Road, Bradley Stoke, Bristol BS32 4QL. While the limited company was incorporated in 2024, the core team brings over 10 years of design-and-build experience in solar PV, battery storage, and EV charge point installations for homes and businesses across the South West.

The company holds MCS (Microgeneration Certification Scheme) accreditation for certified solar PV systems, NICEIC compliance for UK electrical safety standards, and RECC (Renewable Energy Consumer Code) membership for consumer protection and ethical business practices. JTD Solar serves both residential and commercial clients, delivering large-scale and domestic PV solar installation, design, and commissioning projects.

On Google, JTD Solar holds a 5.0-star rating from 70 reviews. Customers commend the team for their friendly and knowledgeable approach, competitive pricing compared to national companies, and thorough explanations of solar options during the installation process. The company is open Monday to Friday 7:30am to 6pm and Saturday 8am to 12pm.

Service Area

JTD Solar serves the following areas within a 60 km radius:

BristolBathSouth GloucestershireBradley Stoke

Are you JTD Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS NICEIC RECC

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

70 reviews

Tony

15 June 2025
Verified Customer

JTD Group were very friendly, knowledgeable and professional throughout. Nothing was ever too much trouble. The install was completed to a very high standard and on time, and I would highly recommend this company for the service, execution and their competitive pricing.

Verified Customer

20 March 2025
Verified Customer

Superb service from quotation to completion. Excellent team of professionals who went above and beyond what we had expected.

Verified Customer

10 November 2024
Verified Customer

Jack, Ben and their team are the most professional company we have had the pleasure to deal with. From designing our solar system, installation and producing all the necessary paperwork at the end we can't fault them.

Frequently Asked Questions About JTD Solar

What services does JTD Solar offer?

JTD Solar offers Solar Installation, Battery Storage, EV Charging.

Is JTD Solar MCS certified?

Yes, JTD Solar is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does JTD Solar serve?

JTD Solar serves Bristol, Bath, South Gloucestershire, Bradley Stoke. They are based in Bristol with a service radius of 60 km.

What warranty does JTD Solar offer?

JTD Solar offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are JTD Solar's customer reviews?

JTD Solar has a 5/5 rating based on 70 customer reviews. Customers consistently rate them highly.

How long has JTD Solar been in business?

JTD Solar was founded in 2024 and has been in business for 2 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from JTD Solar

Fill in your details and we'll connect you with JTD Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote