EcoSheffield
Local, honest solar PV and battery storage installer serving Sheffield and South Yorkshire
1+
Years in Business
30
Customer Reviews
50 km
Service Area
2-10
Employees
SurgePV Score
About EcoSheffield
EcoSheffield (trading as EcoSheff Ltd) is a solar panel and battery storage installer based in Sheffield, operating from Unit 3, Neepsend House, 1 Percy Street, S3 8BT. Incorporated in January 2025, the company has quickly established itself as a trusted local option for homeowners across Sheffield, Rotherham, Worksop, and Doncaster looking for straightforward, honest renewable energy installations.
The company is MCS certified, NAPIT approved, and backed by RECC and IWA accreditations. EcoSheffield is a certified installer of AlphaESS and Tesla Powerwall 3 battery systems, as well as Evec EV chargers. Finance options are available through Phoenix Financial Consultants to help customers spread the cost of their installations.
On Trustpilot, EcoSheffield holds an “Excellent” 4.5-star rating from 30 reviews. Customers frequently praise the team’s honest, no-pressure approach, clear explanations of savings and returns, and the quality of their installations. The company has built its reputation on being a smaller, local operation that prioritises transparency and personal service over high-volume sales.
Service Area
EcoSheffield serves the following areas within a 50 km radius:
Contact Information
Are you EcoSheffield?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
10 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.5
30 reviews
Verified Customer
Great lads to deal with, Adam and Sam, very pleased with the efficient, tidy install by great roofing guys, everyone was so friendly and helpful.
Verified Customer
Good, professional local company. Great to work with from start to finish. Explained everything and was open and honest about savings and returns. I would highly recommend EcoSheffield.
Verified Customer
I found EcoSheffield through an online search and was immediately drawn to their more casual, honest approach as a smaller local company looking to grow. Sam was very much my kind of guy, a tech-savvy, data-driven geek who patiently walked me through everything.
Frequently Asked Questions About EcoSheffield
What services does EcoSheffield offer?
EcoSheffield offers Solar Installation, Battery Storage, EV Charging.
Is EcoSheffield MCS certified?
Yes, EcoSheffield is MCS certified and also holds NAPIT, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does EcoSheffield serve?
EcoSheffield serves Sheffield, Rotherham, Worksop, Doncaster. They are based in Sheffield with a service radius of 50 km.
What warranty does EcoSheffield offer?
EcoSheffield offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.
How are EcoSheffield's customer reviews?
EcoSheffield has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has EcoSheffield been in business?
EcoSheffield was founded in 2025 and has been in business for 1 year. They are a newer entrant in the solar installation market.
Similar Installers in Sheffield
Get a Free Solar Quote from EcoSheffield
Fill in your details and we'll connect you with EcoSheffield.
Quote request sent!
EcoSheffield will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile