ES

Ecostar Solar

MCS and HIES certified solar installer serving Leicester, Northampton, and the Midlands

Leicester, UK
4.6 (20 reviews)
Verified
Residential Commercial

4+

Years in Business

20

Customer Reviews

80 km

Service Area

2-10

Employees

SurgePV Score

7.1 / 10
Customer Reviews
92%
Certifications
75%
Experience
70%
Services Range
90%
Warranty Coverage
0%
Online Presence
50%

About Ecostar Solar

Ecostar Solar is a solar panel installation company based at 4A Pond Wood Close, Moulton Park Industrial Estate, Northampton, NN3 6RT. The company supplies and installs high-quality solar panels and solar battery storage solutions to homes across the Midlands, including Leicester, Northampton, Milton Keynes, Birmingham, Oxford, Luton, and Cambridge.

The company holds MCS and HIES accreditations, ensuring that installations meet industry guidelines and high-quality standards while complying with consumer protection codes. Ecostar Solar provides a complete service from initial quote and system design through to installation and commissioning, typically completing residential installations within two days.

Ecostar Solar has earned positive reviews from customers who praise the competitive pricing, quick installation turnaround, and quality of aftercare. Reviewers highlight the pre-installation site visits, professional teams, and responsive post-installation support.

Service Area

Ecostar Solar serves the following areas within a 80 km radius:

LeicesterNorthamptonMilton KeynesBirminghamOxfordLuton

Are you Ecostar Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

MCS HIES

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.6

20 reviews

Verified Customer

10 November 2025
Verified Customer

From the initial quote and design to the installation the guys were great. Really good price and the installation was all done in two days.

Verified Customer

5 September 2025
Verified Customer

There was a pre-installation visit, the work was completed quickly and effectively, and the aftercare was outstanding.

Verified Customer

1 July 2025
Verified Customer

Very professional team. The system was designed to suit our property and the installation was clean and efficient.

Frequently Asked Questions About Ecostar Solar

What services does Ecostar Solar offer?

Ecostar Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is Ecostar Solar MCS certified?

Yes, Ecostar Solar is MCS certified and also holds HIES certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Ecostar Solar serve?

Ecostar Solar serves Leicester, Northampton, Milton Keynes, Birmingham, Oxford, Luton. They are based in Leicester with a service radius of 80 km.

What warranty does Ecostar Solar offer?

Contact Ecostar Solar directly for their current warranty terms.

How are Ecostar Solar's customer reviews?

Ecostar Solar has a 4.6/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Ecostar Solar been in business?

Ecostar Solar was founded in 2022 and has been in business for 4 years. They are a newer entrant in the solar installation market.

Get a Free Solar Quote from Ecostar Solar

Fill in your details and we'll connect you with Ecostar Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote