Ecostar Solar
MCS and HIES certified solar panel installers serving Northampton and the Midlands
2026+
Years in Business
20
Customer Reviews
80 km
Service Area
11-50
Employees
SurgePV Score
About Ecostar Solar
Ecostar Solar is a Northampton-based solar panel installer serving homes, businesses, and schools across the Midlands and South East England. The company holds MCS (Microgeneration Certification Scheme) and HIES (Home Insulation and Energy Systems Quality Assured Contractors Scheme) certifications, meaning installations are carried out to the highest industry standards and customers are protected under a recognised consumer code.
The company covers a wide service area from its Northampton base, including Birmingham, Milton Keynes, Leicester, Oxford, and Cambridge. This regional reach allows Ecostar Solar to serve both urban and rural properties across the central England corridor.
Ecostar Solar installs solar PV systems and battery storage solutions for residential and commercial customers. All installations are designed to maximise energy generation for the specific property, taking into account roof orientation, shading, and local irradiance data. Battery storage integration allows customers to store surplus daytime generation and use it in the evenings, reducing reliance on grid electricity.
As an MCS and HIES certified installer, Ecostar Solar’s customers are eligible for the Smart Export Guarantee (SEG), through which energy suppliers pay homeowners for excess solar electricity exported to the grid. The HIES certification also provides additional consumer protection, including deposit protection and an insurance-backed guarantee on workmanship.
Customer reviews note a thorough installation process, with the team completing full residential systems within two days and providing clear guidance on system monitoring after completion.
Service Area
Ecostar Solar serves the following areas within a 80 km radius:
Contact Information
Are you Ecostar Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Ecostar Solar
What services does Ecostar Solar offer?
Ecostar Solar offers Solar Installation, Battery Storage.
Is Ecostar Solar MCS certified?
Yes, Ecostar Solar is MCS certified and also holds HIES certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Ecostar Solar serve?
Ecostar Solar serves Northampton, Birmingham, Milton Keynes, Leicester, Oxford, Cambridge. They are based in Northampton with a service radius of 80 km.
What warranty does Ecostar Solar offer?
Ecostar Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Ecostar Solar's customer reviews?
Ecostar Solar has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Ecostar Solar been in business?
Ecostar Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Northampton
Get a Free Solar Quote from Ecostar Solar
Fill in your details and we'll connect you with Ecostar Solar.
Quote request sent!
Ecostar Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile