S(

Solar4Good (Northampton)

MCS, NAPIT, and HIES certified national solar installer serving Northamptonshire with 4.8-star Trustpilot rating

Northampton, UK
4.8 (550 reviews)
Verified
Residential Commercial

6+

Years in Business

0

550

Customer Reviews

80 km

Service Area

51-200

Employees

SurgePV Score

7.8 / 10
Customer Reviews
96%
Certifications
100%
Experience
70%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About Solar4Good (Northampton)

Solar4Good UK Ltd is a national MCS-certified solar panel installer headquartered in Stanmore, HA7 1GB (Howard Road), founded in 2020. The company serves Northamptonshire from its national network and can be reached on 0800 999 1454. Solar4Good is increasingly active in Northamptonshire, including Northampton, Wellingborough, Kettering, Corby, Daventry, and Towcester.

The company holds an extensive accreditation set: MCS, NAPIT, HIES, TrustMark, ICO, and EPVS. Solar4Good is also a Tesla Powerwall 3 Certified Installer, allowing it to supply and fit Tesla’s latest battery storage product. The company was recognised by the Federation of Master Builders (FMB) in 2026 as one of the UK’s Best Solar Panel Installers for customer service excellence.

Solar4Good reports over 1,500 annual installations across the UK and has grown since 2020 to operate six offices. The team is described as using in-house accredited installation crews and providing ongoing aftercare support through a dedicated app. The company’s quote-to-installation timeline is frequently under two weeks according to customer reviews.

On Trustpilot, Solar4Good holds a 4.8-star rating across 550+ reviews. Customer feedback consistently highlights competitive pricing, no-pressure sales, and fast and friendly installation teams. Clear communication from survey through to commissioning is a recurring positive theme in customer responses.

The HIES accreditation provides deposit protection and insurance-backed workmanship guarantees. All solar panel systems come with a 25-year manufacturer performance guarantee.

Service Area

Solar4Good (Northampton) serves the following areas within a 80 km radius:

NorthamptonWellingboroughKetteringCorbyDaventryTowcester

Are you Solar4Good (Northampton)?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS NAPIT HIES TrustMark

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Solar4Good (Northampton)

What services does Solar4Good (Northampton) offer?

Solar4Good (Northampton) offers Solar Installation, Battery Storage, EV Charging.

Is Solar4Good (Northampton) MCS certified?

Yes, Solar4Good (Northampton) is MCS certified and also holds NAPIT, HIES, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Solar4Good (Northampton) serve?

Solar4Good (Northampton) serves Northampton, Wellingborough, Kettering, Corby, Daventry, Towcester. They are based in Northampton with a service radius of 80 km.

What warranty does Solar4Good (Northampton) offer?

Solar4Good (Northampton) offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar4Good (Northampton)'s customer reviews?

Solar4Good (Northampton) has a 4.8/5 rating based on 550 customer reviews. Customers consistently rate them highly.

How long has Solar4Good (Northampton) been in business?

Solar4Good (Northampton) was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Solar4Good (Northampton)

Fill in your details and we'll connect you with Solar4Good (Northampton).

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote