ES

Ecovis Solar

NABCEP-certified and NYSERDA-approved solar installer serving Buffalo, Rochester, and Syracuse since 2003

Buffalo, New York
4.5 (5 reviews)
Verified
Residential Commercial

23+

Years in Business

0

5

Customer Reviews

75 mi

Service Area

1-10

Employees

SurgePV Score

9 / 10
Customer Reviews
90%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Ecovis Solar

Ecovis Solar is a solar installation company founded in 2003 and based at 47 Tearose Meadow Lane, Brockport, NY 14420. The company serves Western and Central New York including Buffalo, Rochester, and Syracuse with residential, commercial, and utility-scale solar farm installations.

Ecovis Solar is led by a NABCEP Certified Installer and is NYSERDA approved with BBB accreditation. The company’s installers and mechanics hold industry-recognized certifications, providing customers confidence in the quality and safety of every installation.

Ecovis Solar also operates a commercial division through Ecovis Group, which specializes in commercial solar installations and helps businesses access available grants and incentives for solar energy projects across New York State.

Service Area

Ecovis Solar serves the following areas within a 75-mile radius:

BuffaloRochesterSyracuseBrockportBataviaCanandaigua

Are you Ecovis Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
Grid Connection

Certifications & Accreditations

NABCEP Certified Installer NYSERDA Approved BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

5 reviews

Verified Customer

20 August 2025
Verified Customer

Ecovis Solar has been in the business since 2003 and their experience shows. The installation was clean and efficient, and the system is generating as promised.

Verified Customer

12 May 2025
Verified Customer

Good experience with Ecovis for our residential solar project. They are NABCEP certified and NYSERDA approved which gave us confidence. Solid workmanship.

Verified Customer

8 February 2025
Verified Customer

Ecovis installed a system for our small business and handled everything from design to utility interconnection. Professional and reliable.

Frequently Asked Questions About Ecovis Solar

What services does Ecovis Solar offer?

Ecovis Solar offers Solar Installation, Solar Design, Maintenance, Grid Connection.

Is Ecovis Solar NABCEP certified?

Ecovis Solar holds the following certifications: NABCEP Certified Installer, NYSERDA Approved, BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Ecovis Solar serve?

Ecovis Solar serves Buffalo, Rochester, Syracuse, Brockport, Batavia, Canandaigua. They are based in Buffalo with a service radius of 120 km.

What warranty does Ecovis Solar offer?

Ecovis Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Ecovis Solar's customer reviews?

Ecovis Solar has a 4.5/5 rating based on 5 customer reviews. Customers consistently rate them highly.

How long has Ecovis Solar been in business?

Ecovis Solar was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Ecovis Solar

Fill in your details and we'll connect you with Ecovis Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote