Edan Power
MCS, NICEIC, and HIES-regulated solar installer in Birmingham serving residential and commercial clients since 2010
16+
Years in Business
28
Customer Reviews
60 km
Service Area
SurgePV Score
About Edan Power
Edan Power is a solar panel installation company based at Leslie Square, Office 24 Block C, Paper Mill End in Great Barr, Birmingham. Founded in 2010, the company is regulated by MCS, NICEIC, and HIES, ensuring installations meet the highest industry standards. Edan Power provides a full turnkey service from initial consultation and custom solar design through to professional installation and ongoing maintenance.
The company serves both residential and commercial clients across Birmingham and the wider West Midlands. For commercial and industrial projects, Edan Power works across sectors including manufacturing, agriculture, retail, hospitality, and logistics. Their in-house team handles system design, procurement, installation, and post-installation monitoring.
Edan Power holds a 4.8 rating from 28 reviews, with customers consistently praising the team’s professionalism and efficient project delivery. As an MCS-certified installer, their systems qualify for the Smart Export Guarantee and 0% VAT on domestic installations. The company also offers 12 months of post-installation maintenance as standard.
Service Area
Edan Power serves the following areas within a 60 km radius:
Contact Information
Are you Edan Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
28 reviews
Great Barr Homeowner
Professional from start to finish. The team designed a system that fits our roof perfectly and the installation was completed on time. Already seeing savings on our energy bills.
Birmingham Business Owner
Edan Power handled our commercial installation efficiently. The project manager kept us informed throughout and the system has been performing above projections.
Frequently Asked Questions About Edan Power
What services does Edan Power offer?
Edan Power offers Solar Installation, Battery Storage, Maintenance, Energy Audit.
Is Edan Power MCS certified?
Yes, Edan Power is MCS certified and also holds NICEIC, HIES certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Edan Power serve?
Edan Power serves Birmingham, Great Barr, Wolverhampton, Walsall, Solihull, Coventry. They are based in Birmingham with a service radius of 60 km.
What warranty does Edan Power offer?
Edan Power offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Edan Power's customer reviews?
Edan Power has a 4.8/5 rating based on 28 customer reviews. Customers consistently rate them highly.
How long has Edan Power been in business?
Edan Power was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Birmingham
Get a Free Solar Quote from Edan Power
Fill in your details and we'll connect you with Edan Power.
Quote request sent!
Edan Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile