Edan Power
Midlands solar installer with 30,000+ panels installed, offering residential and commercial solar solutions serving Leicester
14+
Years in Business
22
Customer Reviews
100 km
Service Area
11-50
Employees
SurgePV Score
About Edan Power
Edan Power is a Midlands-based solar installation company located at Leslie Square, Office 24 Block C, Paper Mill End, Great Barr, Birmingham, B44 8NH. Founded in 2012, the company is an experienced solar panel installer serving the West Midlands, East Midlands, and customers across the UK. Edan Power has installed over 30,000 solar panels, including residential rooftop systems, large-scale commercial installations, and off-grid setups.
The company holds MCS, NAPIT, and TrustMark accreditations and offers a full turnkey service from initial consultation and custom solar design to professional installation and ongoing maintenance. Edan Power works with both domestic and commercial clients, providing tailored energy solutions that include solar PV, battery storage, and EV charging systems.
With 22 reviews on Trustpilot, Edan Power has earned strong ratings from customers who praise the ease of the process, fast and efficient installations, and courteous, helpful teams. The company provides free site surveys, detailed system designs, and comprehensive aftercare support.
Service Area
Edan Power serves the following areas within a 100 km radius:
Contact Information
Are you Edan Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.7
22 reviews
Verified Customer
Everything with Edanpower was so easy and quick. Installation was fast and efficient and the team were so courteous and helpful.
Verified Customer
A solid 10 out of 10 from start to finish. The customer service and quality make Edanpower exceptional in the solar world.
Verified Customer
Professional team who designed a system perfectly suited to our needs. The installation was completed in a single day.
Frequently Asked Questions About Edan Power
What services does Edan Power offer?
Edan Power offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.
Is Edan Power MCS certified?
Yes, Edan Power is MCS certified and also holds NAPIT, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Edan Power serve?
Edan Power serves Leicester, Birmingham, Coventry, Wolverhampton, Nottingham, East Midlands. They are based in Leicester with a service radius of 100 km.
What warranty does Edan Power offer?
Contact Edan Power directly for their current warranty terms.
How are Edan Power's customer reviews?
Edan Power has a 4.7/5 rating based on 22 customer reviews. Customers consistently rate them highly.
How long has Edan Power been in business?
Edan Power was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.
Similar Installers in Leicester
Get a Free Solar Quote from Edan Power
Fill in your details and we'll connect you with Edan Power.
Quote request sent!
Edan Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile