Edison Solar
Northern Ohio's leading solar installation and distribution company since 2007 — residential and commercial systems
19+
Years in Business
15
Customer Reviews
93 mi
Service Area
1-10
Employees
SurgePV Score
About Edison Solar
Edison Solar is a solar installation and distribution company founded in 2007 and located at 3809 State Route 113 E, Milan, OH 44846, in northern Ohio on the shores of Lake Erie. The company serves the Greater Cleveland area including Sandusky, Lorain, Elyria, and surrounding counties with residential, commercial, and industrial solar installations.
Edison Solar is NABCEP certified and offers a wide range of equipment from leading manufacturers. Panel brands include Canadian Solar, Qcells, Trina, and Jinko. Inverter options include Enphase, SMA, and Fronius. The company uses IronRidge, Unirac, and ProSolar mounting systems. Edison Solar installed the largest solar arrays in North Central Ohio.
The company provides custom-designed solar electric energy systems for residential, commercial, and industrial applications, along with solar equipment distribution and parts sales. Edison Solar can be reached by calling 419-499-0000 or emailing [email protected].
Service Area
Edison Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Edison Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
10 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
15 reviews
Verified Customer
Edison Solar designed and installed our commercial system with precision. Dr. Miller's technical expertise ensured we got the optimal panel layout.
Verified Customer
Excellent residential installation. They offered a wide selection of panel and inverter brands and helped us choose the best fit for our budget.
Verified Customer
Professional service from design through installation. The system is performing well and producing as projected.
Frequently Asked Questions About Edison Solar
What services does Edison Solar offer?
Edison Solar offers Solar Installation, Battery Storage, Maintenance.
Is Edison Solar NABCEP certified?
Edison Solar holds the following certifications: NABCEP Certified. Contact them directly for the latest accreditation details.
What areas does Edison Solar serve?
Edison Solar serves Cleveland, Sandusky, Lorain, Elyria, Milan. They are based in Cleveland with a service radius of 150 km.
What warranty does Edison Solar offer?
Edison Solar offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.
How are Edison Solar's customer reviews?
Edison Solar has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Edison Solar been in business?
Edison Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Cleveland
Get a Free Solar Quote from Edison Solar
Fill in your details and we'll connect you with Edison Solar.
Quote request sent!
Edison Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile