Emerald Energy
Raleigh-based solar contractor serving Charlotte and 77% of North Carolina with a 25-year workmanship warranty since 2009
17+
Years in Business
116
Customer Reviews
124 mi
Service Area
2-10
Employees
SurgePV Score
About Emerald Energy
Emerald Energy is a fully licensed North Carolina General and Electrical Contractor and solar company headquartered at 3201 Wellington Court, Suite 103, Raleigh, NC 27615. Founded in 2009, the company provides design, consulting, and turnkey installations of solar PV projects for residential, commercial, and off-grid applications. Emerald Energy covers approximately 77% of North Carolina, including Charlotte, Raleigh, Greensboro, Durham, and surrounding areas.
The company holds NABCEP certification alongside BPI Accredited Contractor status, and is certified by Tesla, Enphase, Generac, Fortress Battery, and Sol-Ark. Emerald Energy installs panels from Canadian Solar and Q Cells, paired with Enphase, SolarEdge, and Sol-Ark inverters. Battery storage options include Tesla Powerwall, Enphase, Fortress Power, and Generac systems. The company handles every stage of the project from initial energy audit through final inspection.
Emerald Energy has been the top contractor on EnergySage in North Carolina since 2013, earning a perfect 5.0-star rating from 116 reviews on the platform. The company also holds a 5.0 rating on HomeAdvisor and the Chamber of Commerce. All installations include a 25-year workmanship warranty and a 25-year roof penetration warranty. Despite being a smaller company with a tight-knit team, Emerald Energy consistently delivers top-rated service across the state.
Service Area
Emerald Energy serves the following areas within a 124-mile radius:
Contact Information
Are you Emerald Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
116 reviews
Richard B.
Emerald Energy designed and installed a 10 kW system with battery backup for our Charlotte home. The team was thorough during the site assessment and the installation was clean and professional. System has been producing above estimates.
Laura K.
We compared five solar quotes across Charlotte and Emerald Energy offered the best combination of equipment quality, warranty, and price. The installation crew was efficient and respectful of our property.
George T.
Outstanding experience from consultation to commissioning. Their NABCEP-certified team explained every aspect of the design and helped us choose the right battery system for our needs. Highly recommend.
Frequently Asked Questions About Emerald Energy
What services does Emerald Energy offer?
Emerald Energy offers Solar Installation, Battery Storage, Solar Design, Energy Audit, off_grid_solar, Commercial Solar.
Is Emerald Energy NABCEP certified?
Emerald Energy holds the following certifications: NABCEP Certified, BPI Accredited Contractor, Tesla Powerwall Certified, Enphase Certified, Generac Powercell Certified, Fortress Battery Certified Gold Installer, Sol-Ark Certified. Contact them directly for the latest accreditation details.
What areas does Emerald Energy serve?
Emerald Energy serves Charlotte, Raleigh, Greensboro, Durham, Winston-Salem, Cary, Fayetteville, Wilmington. They are based in Charlotte with a service radius of 200 km.
What warranty does Emerald Energy offer?
Emerald Energy offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Emerald Energy's customer reviews?
Emerald Energy has a 5/5 rating based on 116 customer reviews. Customers consistently rate them highly.
How long has Emerald Energy been in business?
Emerald Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Charlotte
Get a Free Solar Quote from Emerald Energy
Fill in your details and we'll connect you with Emerald Energy.
Quote request sent!
Emerald Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile