ES

EmPower Solar

New York's premier SunPower Master Dealer with over 4,000 installations and 50 MW of distributed solar since 2003

New York, New York
4.5 (36 reviews)
Verified
Residential Commercial

23+

Years in Business

4,000+

Projects Completed

36

Customer Reviews

50 mi

Service Area

51-200

Employees

SurgePV Score

8.8 / 10
Customer Reviews
90%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About EmPower Solar

EmPower Solar is one of New York’s most established solar installation companies, founded in 2003 with headquarters at 999 Stewart Ave, Suite 210 in Bethpage, NY. The company also operates a dedicated Queens office to serve New York City customers directly. EmPower Solar has installed over 4,000 residential and commercial solar systems totaling 50 megawatts of distributed solar capacity.

The company is the only Long Island-based SunPower Master Dealer, providing customers access to the industry’s highest-efficiency solar panels backed by SunPower’s combined power and product warranty. EmPower Solar is NYSERDA certified and has been empowering New York homeowners and businesses for over two decades.

EmPower Solar serves Nassau, Suffolk, Westchester, Queens, Brooklyn, Bronx, Staten Island, and Manhattan. The company provides residential and commercial solar installation, community solar programs, EV charging station infrastructure, and battery backup systems. EmPower handles all aspects of the process from system design through permitting, installation, and utility interconnection.

Service Area

EmPower Solar serves the following areas within a 50-mile radius:

QueensBrooklynManhattanBronxStaten IslandLong Island

Are you EmPower Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Maintenance
Monitoring
Grid Connection

Certifications & Accreditations

SunPower Master Dealer NYSERDA Certified

Partner Manufacturers

Panels

SunPower

Inverters

SunPowerEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

36 reviews

Christine B.

18 September 2025
Verified Customer

EmPower Solar's experience with NYC buildings is evident. They handled our Queens installation professionally and dealt with all Con Edison paperwork.

Richard H.

10 June 2025
Verified Customer

As the only Long Island-based SunPower Master Dealer, EmPower delivers premium panels and quality installation. Our system is producing more than estimated.

Laura T.

5 March 2025
Verified Customer

Good experience with EmPower Solar for our residential installation. The SunPower panels look great and the system has been performing well since day one.

Frequently Asked Questions About EmPower Solar

What services does EmPower Solar offer?

EmPower Solar offers Solar Installation, Battery Storage, EV Charging, Solar Design, Maintenance, Monitoring, Grid Connection.

Is EmPower Solar NABCEP certified?

EmPower Solar holds the following certifications: SunPower Master Dealer, NYSERDA Certified. Contact them directly for the latest accreditation details.

What areas does EmPower Solar serve?

EmPower Solar serves Queens, Brooklyn, Manhattan, Bronx, Staten Island, Long Island. They are based in New York with a service radius of 80 km.

What warranty does EmPower Solar offer?

EmPower Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are EmPower Solar's customer reviews?

EmPower Solar has a 4.5/5 rating based on 36 customer reviews. Customers consistently rate them highly.

How long has EmPower Solar been in business?

EmPower Solar was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from EmPower Solar

Fill in your details and we'll connect you with EmPower Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote