EMPWR Solar
Charleston solar EPC providing seamless residential installations from consultation through activation
7+
Years in Business
20
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About EMPWR Solar
EMPWR Solar is a solar EPC (Engineering, Procurement, and Construction) company with offices at 677 King Street, 3rd Floor, in Charleston and 1007 Johnnie Dodds Blvd, Suite 111, in Mount Pleasant. The company focuses on residential solar installations, providing a streamlined experience from initial consultation through system design, permitting, installation, and utility activation. EMPWR Solar operates across South Carolina and several other southeastern states.
The company installs panels from REC and Hanwha Q Cells, paired with Enphase microinverters. Battery storage options include the Tesla Powerwall. EMPWR Solar emphasizes project management and customer communication, assigning dedicated project coordinators who keep homeowners informed at each stage. The company’s dual-location presence in downtown Charleston and Mount Pleasant gives customers convenient access for in-person consultations.
EMPWR Solar holds a 4.6-star rating across review platforms and is BBB accredited. The company’s approach centers on making the solar installation process as straightforward as possible for homeowners, handling all technical details, permitting, and utility coordination internally. Customers highlight the responsive communication and professional installation crews.
Service Area
EMPWR Solar serves the following areas within a 62-mile radius:
Contact Information
Are you EMPWR Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
20 reviews
Scott P.
EMPWR made the whole process painless. The consultation was informative, the design matched our needs perfectly, and the installation crew was fast and professional.
Linda F.
Great communication throughout the project. They kept us informed at every step and the system was activated ahead of schedule. Our electric bills have dropped significantly.
Ryan C.
Solid company with good customer service. The installation quality is excellent and the system has been performing well. Would recommend to friends and family.
Frequently Asked Questions About EMPWR Solar
What services does EMPWR Solar offer?
EMPWR Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection.
Is EMPWR Solar NABCEP certified?
EMPWR Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does EMPWR Solar serve?
EMPWR Solar serves Charleston, Mount Pleasant, North Charleston, Summerville, James Island, Goose Creek, Kiawah Island. They are based in Charleston with a service radius of 100 km.
What warranty does EMPWR Solar offer?
EMPWR Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are EMPWR Solar's customer reviews?
EMPWR Solar has a 4.6/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has EMPWR Solar been in business?
EMPWR Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Charleston
Get a Free Solar Quote from EMPWR Solar
Fill in your details and we'll connect you with EMPWR Solar.
Quote request sent!
EMPWR Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile