ED

Energy Design

Eugene's locally owned solar contractor with over 1,000 installations and 20 years of experience since 2004

Eugene, Oregon
4.8 (30 reviews)
Verified
Residential Commercial

22+

Years in Business

1,000+

Projects Completed

30

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

9.2 / 10
Customer Reviews
96%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
83%
Online Presence
100%

About Energy Design

Energy Design is a locally owned and operated solar energy contractor based at 860 Conger Street, Suite 12, in Eugene, Oregon. Founded in 2004, the company is a full-service electrical and solar contracting firm with over 1,000 installations across Oregon, ranging from 1 kW residential systems to 200 kW commercial projects.

The company installs panels from SunPower, REC, Silfab, and Mission Solar alongside inverters from SMA, SolarEdge, Sol-Ark, Enphase, and Fronius. All racking systems use IronRidge equipment. Energy Design also provides energy storage solutions, EV charging installation, and building-integrated racking solutions. Warranties include 25-30 year solar panel workmanship with production guarantee, 10-25 year inverter warranty, 25 year racking workmanship warranty, and a 7-year parts, labor, roof, and service warranty.

Energy Design is an Energy Trust of Oregon Trade Ally and maintains strong customer reviews, with clients praising the company’s decades of local experience and attention to detail in system design and installation.

Service Area

Energy Design serves the following areas within a 93-mile radius:

EugeneSpringfieldCorvallisAlbanyCottage Grove

Are you Energy Design?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design
Maintenance
Monitoring

Certifications & Accreditations

Energy Trust of Oregon Trade Ally Oregon Contractor License

Partner Manufacturers

Panels

SunPowerRECSilfabMission Solar

Inverters

SMASolarEdgeSol-ArkEnphaseFronius

Warranty Coverage

Panel Warranty

30 years

Inverter Warranty

25 years

Installation Warranty

7 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

30 reviews

Jeff D.

12 October 2025
Verified Customer

Energy Design has been our go-to solar company for years. They replaced a faulty inverter quickly and their staff has decades of experience. True professionals.

Monica R.

25 August 2025
Verified Customer

Locally owned and it shows. They took the time to design a system optimized for our roof and the installation was clean and professional.

Daniel K.

8 June 2025
Verified Customer

Over 1,000 installations in Oregon and it shows in their expertise. Our system is performing exactly as promised. Great warranty coverage too.

Frequently Asked Questions About Energy Design

What services does Energy Design offer?

Energy Design offers Solar Installation, Battery Storage, EV Charging, Solar Design, Maintenance, Monitoring.

Is Energy Design NABCEP certified?

Energy Design holds the following certifications: Energy Trust of Oregon Trade Ally, Oregon Contractor License. Contact them directly for the latest accreditation details.

What areas does Energy Design serve?

Energy Design serves Eugene, Springfield, Corvallis, Albany, Cottage Grove. They are based in Eugene with a service radius of 150 km.

What warranty does Energy Design offer?

Energy Design offers 30-year panel warranty, 25-year inverter warranty, and 7-year installation/workmanship warranty.

How are Energy Design's customer reviews?

Energy Design has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has Energy Design been in business?

Energy Design was founded in 2004 and has been in business for 22 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Energy Design

Fill in your details and we'll connect you with Energy Design.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote