ES

Envision Solar

Arizona solar installer since 2014 with 500+ five-star reviews and 30+ years of combined solar experience

Scottsdale, Arizona
4.9 (500 reviews)
Verified
Residential Commercial

12+

Years in Business

500

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
98%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Envision Solar

Envision Solar is a solar energy company founded in 2014 and located at 2155 W Pinnacle Peak Road, Suite 101, Phoenix, Arizona 85027. The company provides residential and commercial solar installation services across the Phoenix and Tucson metropolitan areas, with over 30 years of combined solar experience on its team.

Envision Solar is BBB-accredited and has earned more than 500 five-star reviews, making it one of the most highly reviewed solar installers in Arizona. The company serves Scottsdale, Phoenix, Tempe, Mesa, Gilbert, Chandler, Tucson, and surrounding communities with solar panel installation, battery storage, and ongoing maintenance services.

The company holds a 4.9-star rating from 500 reviews and has built a reputation for professional service, transparent pricing, and reliable system performance. Envision Solar offers free home inspections and solar quotes to help homeowners evaluate their solar potential.

Service Area

Envision Solar serves the following areas within a 50-mile radius:

ScottsdalePhoenixTempeMesaGilbertChandlerTucson

Are you Envision Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

500 reviews

Chris B.

15 September 2025
Verified Customer

Envision Solar made the process incredibly simple. From the initial quote to the final inspection, everything was handled professionally. The system is producing exactly as promised.

Deborah P.

8 June 2025
Verified Customer

Outstanding company with outstanding service. The installation crew was efficient and respectful. Our electric bill has dropped dramatically and the system looks great on our roof.

Steve N.

2 March 2025
Verified Customer

Five hundred plus five-star reviews do not lie. Envision Solar delivered on every promise. Highly recommend for anyone in the Phoenix or Scottsdale area looking to go solar.

Frequently Asked Questions About Envision Solar

What services does Envision Solar offer?

Envision Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance.

Is Envision Solar NABCEP certified?

Envision Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Envision Solar serve?

Envision Solar serves Scottsdale, Phoenix, Tempe, Mesa, Gilbert, Chandler, Tucson. They are based in Scottsdale with a service radius of 80 km.

What warranty does Envision Solar offer?

Envision Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Envision Solar's customer reviews?

Envision Solar has a 4.9/5 rating based on 500 customer reviews. Customers consistently rate them highly.

How long has Envision Solar been in business?

Envision Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Envision Solar

Fill in your details and we'll connect you with Envision Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote