ES

ESD Solar

BBB A+ rated solar and roofing company serving Sarasota with residential and commercial PV installations since 2015

Sarasota, Florida
4.1 (275 reviews)
Verified
Residential Commercial

11+

Years in Business

0

275

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.3 / 10
Customer Reviews
82%
Certifications
90%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About ESD Solar

ESD Solar, operating as Energy Solutions Direct, is a solar and roofing installation company headquartered at 6076 Park Blvd N, Pinellas Park, FL 33781, serving the greater Tampa Bay area including Sarasota and Bradenton. Founded in 2015, the company provides solar PV installations, battery storage, EV charging, and roofing services for residential and commercial customers throughout Southwest Florida.

ESD Solar holds a BBB A+ rating with accreditation since April 2020, along with Certified Building Contractor and Electrical Contractor licenses. The company offers a broad range of energy services including solar PV, standalone battery storage, smart electrical panels, ground mounts, critter guards, and backup electricity generation. ESD also provides roofing services, making them a single-source option for homeowners who need both a new roof and solar installation.

ESD Solar has a 4.1-star rating from 275 reviews across multiple platforms, making it one of the most-reviewed solar companies serving the Sarasota market. The company serves Sarasota, Bradenton, St. Petersburg, Tampa, Clearwater, Venice, and the surrounding areas.

Service Area

ESD Solar serves the following areas within a 75-mile radius:

SarasotaBradentonSt. PetersburgTampaClearwaterVenicePinellas Park

Are you ESD Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

BBB A+ Rating Certified Building Contractor Certified Electrical Contractor

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.1

275 reviews

Verified Customer

18 August 2025
Verified Customer

ESD Solar handled our Sarasota installation professionally. The system design accounted for our roof angles and shading, and production has been strong since activation.

Verified Customer

5 June 2025
Verified Customer

Good experience overall with ESD. The team was professional and the installation was clean. Battery backup has been a real asset during storm season.

Verified Customer

15 March 2025
Verified Customer

Solid solar installation and fair pricing. ESD handled all the permits and utility paperwork. System is producing close to what was estimated.

Frequently Asked Questions About ESD Solar

What services does ESD Solar offer?

ESD Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is ESD Solar NABCEP certified?

ESD Solar holds the following certifications: BBB A+ Rating, Certified Building Contractor, Certified Electrical Contractor. Contact them directly for the latest accreditation details.

What areas does ESD Solar serve?

ESD Solar serves Sarasota, Bradenton, St. Petersburg, Tampa, Clearwater, Venice, Pinellas Park. They are based in Sarasota with a service radius of 120 km.

What warranty does ESD Solar offer?

ESD Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are ESD Solar's customer reviews?

ESD Solar has a 4.1/5 rating based on 275 customer reviews. They are well-regarded by their customers.

How long has ESD Solar been in business?

ESD Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from ESD Solar

Fill in your details and we'll connect you with ESD Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote