VS

Vulcan Solar Power

NABCEP-certified Birmingham solar installer providing turnkey residential, commercial, and utility-scale solar systems since 2015

Birmingham, Alabama
5 (15 reviews)
Verified
Residential Commercial Industrial

11+

Years in Business

15

Customer Reviews

124 mi

Service Area

2-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
75%
Experience
85%
Services Range
75%
Warranty Coverage
70%
Online Presence
75%

About Vulcan Solar Power

Vulcan Solar Power is a Birmingham-based solar installation company founded in 2015 by CEO Rob Ozols, a NABCEP-certified Photovoltaic Associate. The company provides turnkey solar energy systems for residential, commercial, nonprofit, and utility-scale projects across Alabama, Georgia, and Mississippi. As a licensed General Contractor, Vulcan Solar handles every phase of the project from system design and permitting through installation and final utility interconnection.

The company holds an A+ rating with the Better Business Bureau and maintains NABCEP certification, the industry’s leading credential for solar professionals. Every installation includes real-time monitoring so customers can track energy savings and consumption from day one. Vulcan Solar Power is headquartered at 3433 Lorna Lane in Birmingham and serves the greater Birmingham metro area as well as communities throughout central Alabama.

Vulcan Solar Power has built a reputation for hands-on, owner-involved project management. Rob Ozols personally oversees system design and installation quality, giving customers direct access to the company’s principal throughout the process. The company’s 5.0-star rating reflects consistent delivery of professional solar installations backed by manufacturer warranties and a workmanship guarantee.

Service Area

Vulcan Solar Power serves the following areas within a 124-mile radius:

BirminghamHooverVestavia HillsHomewoodMountain BrookTuscaloosaHuntsvilleMontgomery

Are you Vulcan Solar Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Monitoring

Certifications & Accreditations

NABCEP BBB A+ Rating

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

15 reviews

Verified Customer

15 September 2025
Verified Customer

Rob and his team at Vulcan Solar Power designed and installed a system perfectly suited to our home. The NABCEP certification gave us confidence, and the system has performed exactly as promised since day one.

Verified Customer

20 June 2025
Verified Customer

From the initial consultation through permitting and final interconnection, Vulcan Solar handled everything. The turnkey approach meant we did not have to coordinate with anyone else. Great experience overall.

Verified Customer

10 March 2025
Verified Customer

We chose Vulcan Solar for our commercial installation because they are locally owned and NABCEP certified. The project was completed on schedule and the monitoring system lets us track production in real time.

Frequently Asked Questions About Vulcan Solar Power

What services does Vulcan Solar Power offer?

Vulcan Solar Power offers Solar Installation, Solar Design, Monitoring.

Is Vulcan Solar Power NABCEP certified?

Yes, Vulcan Solar Power is NABCEP certified and also holds BBB A+ Rating certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Vulcan Solar Power serve?

Vulcan Solar Power serves Birmingham, Hoover, Vestavia Hills, Homewood, Mountain Brook, Tuscaloosa, Huntsville, Montgomery. They are based in Birmingham with a service radius of 200 km.

What warranty does Vulcan Solar Power offer?

Vulcan Solar Power offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Vulcan Solar Power's customer reviews?

Vulcan Solar Power has a 5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Vulcan Solar Power been in business?

Vulcan Solar Power was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Vulcan Solar Power

Fill in your details and we'll connect you with Vulcan Solar Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote