Feazel
Award-winning roofing and solar company since 1988 — GAF Timberline Solar Shingles and rack-mount panels
38+
Years in Business
30
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About Feazel
Feazel is an award-winning roofing and solar company founded in 1988, with a Cleveland-area office at 12710 Corporate Dr, Parma, OH 44130. The company serves Cleveland, Parma, Akron, and surrounding communities across Ohio, Indiana, North Carolina, South Carolina, and Tennessee.
Feazel brings 35 years of roofing expertise to solar installation, offering either traditional rack-mount solar panels or GAF Timberline Solar Shingles that integrate directly into the roof. The company holds NABCEP certification, GAF Master Elite certification, GAF Certified Green Roofer status, and EPA Lead-Safe Contractor credentials, along with a BBB A+ rating. All solar products sold by Feazel are rated Tier 1.
Feazel was named Residential Roofing Contractor of the Year in 2021 and continues to expand its solar division. The company provides a 25-year warranty on all solar products and offers combined roof replacement and solar installation projects for maximum efficiency.
Service Area
Feazel serves the following areas within a 75-mile radius:
Contact Information
Are you Feazel?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
30 reviews
Verified Customer
Feazel replaced our roof and installed GAF Timberline Solar Shingles in one project. The integrated look is seamless and the system is producing well.
Verified Customer
As the Residential Roofing Contractor of the Year, their combined roofing and solar expertise is unmatched. Professional crew and clean worksite.
Verified Customer
Good experience with our rack-mount solar installation. Their 35 years of roofing credibility translates well to solar projects.
Frequently Asked Questions About Feazel
What services does Feazel offer?
Feazel offers Solar Installation, Maintenance.
Is Feazel NABCEP certified?
Feazel holds the following certifications: NABCEP Certified, BBB A+, GAF Master Elite Certified, GAF Certified Green Roofer, EPA Lead-Safe Contractor, REC Certified. Contact them directly for the latest accreditation details.
What areas does Feazel serve?
Feazel serves Cleveland, Parma, Akron, Lakewood, Strongsville. They are based in Cleveland with a service radius of 120 km.
What warranty does Feazel offer?
Feazel offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Feazel's customer reviews?
Feazel has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Feazel been in business?
Feazel was founded in 1988 and has been in business for 38 years. They are one of the more experienced solar installers in their area.
Similar Installers in Cleveland
Get a Free Solar Quote from Feazel
Fill in your details and we'll connect you with Feazel.
Quote request sent!
Feazel will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile