FS

FireFly Solar

Award-winning Tesla-certified solar and roofing company ranked number two in South Carolina by Solar Power World

Greenville, South Carolina
4.8 (30 reviews)
Verified
Residential Commercial

10+

Years in Business

0

30

Customer Reviews

50 mi

Service Area

51-100

Employees

SurgePV Score

9.3 / 10
Customer Reviews
96%
Certifications
100%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About FireFly Solar

FireFly Solar is an award-winning solar and roofing company with offices at 1200 Woodruff Rd, Suite F16, Greenville, SC 29607 and 623 Cooper Rd, Piedmont, SC 29673. Founded in 2016, the company was named Best Solar Service Company of the Upstate by the Greenville News in 2023 and ranked as the number two residential solar company in South Carolina by Solar Power World.

FireFly Solar holds Tesla Premier Certified Installer status and is authorized to install both Tesla Powerwall battery systems and Tesla Solar Roof tiles. The company is also an Enphase Encharge certified installer and works with Maxeon solar panels. FireFly Solar maintains a BBB A+ rating.

The company serves residential and commercial customers throughout the Greenville and Upstate South Carolina region, providing solar panel installation, battery storage, EV charger installation, and maintenance services.

Service Area

FireFly Solar serves the following areas within a 50-mile radius:

GreenvilleSpartanburgAndersonSimpsonvillePiedmontGreer

Are you FireFly Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

Tesla Premier Certified Installer Tesla Solar Roof Certified Enphase Encharge Certified BBB A+ Rated

Partner Manufacturers

Panels

Maxeon

Batteries

Tesla PowerwallEnphase Encharge

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

30 reviews

Verified Customer

5 September 2025
Verified Customer

FireFly Solar is the best solar company in the Upstate. Their Tesla certification means they can install Powerwalls and Solar Roof tiles that other companies cannot. Exceptional quality.

Verified Customer

15 July 2025
Verified Customer

Outstanding experience from consultation to final inspection. The Maxeon panels look great and the system is producing more energy than projected. FireFly earned their reputation.

Verified Customer

10 May 2025
Verified Customer

Chose FireFly for their Tesla Powerwall expertise and was not disappointed. Professional installation, excellent communication, and the battery backup gives us peace of mind during storms.

Frequently Asked Questions About FireFly Solar

What services does FireFly Solar offer?

FireFly Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is FireFly Solar NABCEP certified?

FireFly Solar holds the following certifications: Tesla Premier Certified Installer, Tesla Solar Roof Certified, Enphase Encharge Certified, BBB A+ Rated. Contact them directly for the latest accreditation details.

What areas does FireFly Solar serve?

FireFly Solar serves Greenville, Spartanburg, Anderson, Simpsonville, Piedmont, Greer. They are based in Greenville with a service radius of 80 km.

What warranty does FireFly Solar offer?

FireFly Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are FireFly Solar's customer reviews?

FireFly Solar has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has FireFly Solar been in business?

FireFly Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from FireFly Solar

Fill in your details and we'll connect you with FireFly Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote