Florida Electric & Solar
OSHA-certified Tampa solar installer with over 10,000 successful installations since 2008
18+
Years in Business
10,000+
Projects Completed
100
Customer Reviews
62 mi
Service Area
51-200
Employees
SurgePV Score
About Florida Electric & Solar
Florida Electric & Solar is a solar installation company headquartered at 302 Knights Run Avenue, Suite 1150 in Tampa, Florida. Established in 2008, the company has completed over 10,000 successful installations across the state and has recently expanded into the Miami market. Florida Electric & Solar became BBB-accredited in June 2025.
The company’s technicians are OSHA-certified and provide both residential and commercial solar panel installation services. Florida Electric & Solar handles the entire project from initial consultation and system design through engineering, permitting, installation, and final inspection. The company has received over 500 testimonials from satisfied clients, with the vast majority rating the company five stars.
Florida Electric & Solar serves property owners throughout the Tampa Bay metro area and surrounding communities including St. Petersburg, Clearwater, Brandon, and Sarasota. The company is open Monday through Friday, 9:00 AM to 5:00 PM.
Service Area
Florida Electric & Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Florida Electric & Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
100 reviews
Verified Customer
Florida Electric & Solar handled our project from start to finish with complete professionalism. The system has been performing flawlessly.
Verified Customer
Excellent experience. The OSHA-certified crew was thorough and safety-conscious, and the installation was completed on schedule.
Verified Customer
Very satisfied with the installation quality and customer service. They made the whole process simple and kept us informed at every step.
Frequently Asked Questions About Florida Electric & Solar
What services does Florida Electric & Solar offer?
Florida Electric & Solar offers Solar Installation, Battery Storage, system_design.
Is Florida Electric & Solar NABCEP certified?
Florida Electric & Solar holds the following certifications: OSHA. Contact them directly for the latest accreditation details.
What areas does Florida Electric & Solar serve?
Florida Electric & Solar serves Tampa, St. Petersburg, Clearwater, Brandon, Sarasota. They are based in Tampa with a service radius of 100 km.
What warranty does Florida Electric & Solar offer?
Florida Electric & Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Florida Electric & Solar's customer reviews?
Florida Electric & Solar has a 5/5 rating based on 100 customer reviews. Customers consistently rate them highly.
How long has Florida Electric & Solar been in business?
Florida Electric & Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tampa
Get a Free Solar Quote from Florida Electric & Solar
Fill in your details and we'll connect you with Florida Electric & Solar.
Quote request sent!
Florida Electric & Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile