Solar22
NABCEP-certified Tampa Bay solar installer specializing in installation, repair, and maintenance
5+
Years in Business
30
Customer Reviews
37 mi
Service Area
2-10
Employees
SurgePV Score
About Solar22
Solar22 is a NABCEP-certified solar installation company located at 1546 Main Street in Dunedin, Florida, serving the greater Tampa Bay area. Founded in 2021, the company has quickly established itself as a highly rated local solar provider, offering installation, repair, maintenance, and panel removal and reinstallation services for residential and commercial customers.
The company holds an A+ BBB rating and maintains a perfect 5-star Google rating. Solar22 installs panels from REC and Mission Solar Energy, paired with Enphase and SolarEdge inverter systems. All installations include 25-year warranties. The company also holds sales contact at (727) 955-3470 and the additional email [email protected].
Solar22 serves communities throughout Pinellas and Hillsborough counties including Dunedin, Clearwater, Tampa, St. Petersburg, and Palm Harbor. The company distinguishes itself by offering ongoing solar panel maintenance and service plans, in addition to new installations, providing long-term support for system owners across Tampa Bay.
Service Area
Solar22 serves the following areas within a 37-mile radius:
Contact Information
Are you Solar22?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
30 reviews
Verified Customer
Solar22 was fantastic from start to finish. Their NABCEP-certified team installed a high-quality system that has been performing above projections.
Verified Customer
Professional, knowledgeable, and responsive. Solar22 designed a system perfectly suited for our home and completed the installation quickly.
Verified Customer
Great local company that stands behind their work. They also handle maintenance and repair, which gives us confidence for the long term.
Frequently Asked Questions About Solar22
What services does Solar22 offer?
Solar22 offers Solar Installation, Battery Storage, Maintenance, system_design.
Is Solar22 NABCEP certified?
Yes, Solar22 is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar22 serve?
Solar22 serves Tampa, Clearwater, Dunedin, St. Petersburg, Palm Harbor. They are based in Tampa with a service radius of 60 km.
What warranty does Solar22 offer?
Solar22 offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar22's customer reviews?
Solar22 has a 5/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Solar22 been in business?
Solar22 was founded in 2021 and has been in business for 5 years. They have solid experience in the solar industry.
Similar Installers in Tampa
Get a Free Solar Quote from Solar22
Fill in your details and we'll connect you with Solar22.
Quote request sent!
Solar22 will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile