FP

Florida Power Services

State-certified solar power company with 17+ years of experience serving Sarasota and Southwest Florida

Sarasota, Florida
4.3 (10 reviews)
Verified
Residential Commercial

19+

Years in Business

0

10

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

7.6 / 10
Customer Reviews
86%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Florida Power Services

Florida Power Services, known as “The Solar Power Company,” is a state-certified solar installation company headquartered at 503 E Jackson St, Tampa, FL 33602, with extensive operations throughout the Sarasota and Southwest Florida region. Founded in 2007, the company has over 17 years of experience designing and installing solar systems for residential and commercial customers.

The company’s state-certified installation team has gained specialized knowledge of solar design for all Florida roof styles and wind load requirements, a consideration for Sarasota-area homeowners in a hurricane-prone region. Florida Power Services provides a 100% satisfaction guarantee on all solar panel installations and handles system design, permitting, installation, and ongoing maintenance. The company also has an office presence in the Bradenton area at 415 62nd St NW, Bradenton, FL 34209.

Florida Power Services holds a 4.3-star rating from customer reviews on Yelp. The company serves the Tampa Bay area, Sarasota, Bradenton, St. Petersburg, Venice, Lakewood Ranch, and North Port.

Service Area

Florida Power Services serves the following areas within a 75-mile radius:

SarasotaTampaBradentonSt. PetersburgVeniceLakewood RanchNorth Port

Are you Florida Power Services?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

State Certified Solar Contractor

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

10 reviews

Verified Customer

25 July 2025
Verified Customer

Florida Power Services designed a system perfectly sized for our Sarasota home. The installation team was efficient and the system started generating power immediately after inspection.

Verified Customer

12 May 2025
Verified Customer

Good experience with Florida Power Services. The team understands Sarasota's wind load requirements and designed a system that meets all code requirements.

Verified Customer

28 February 2025
Verified Customer

Professional installation and great customer support. Our electricity bills have dropped significantly since going solar with Florida Power Services.

Frequently Asked Questions About Florida Power Services

What services does Florida Power Services offer?

Florida Power Services offers Solar Installation, Battery Storage, Maintenance.

Is Florida Power Services NABCEP certified?

Florida Power Services holds the following certifications: State Certified Solar Contractor. Contact them directly for the latest accreditation details.

What areas does Florida Power Services serve?

Florida Power Services serves Sarasota, Tampa, Bradenton, St. Petersburg, Venice, Lakewood Ranch, North Port. They are based in Sarasota with a service radius of 120 km.

What warranty does Florida Power Services offer?

Florida Power Services offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Florida Power Services's customer reviews?

Florida Power Services has a 4.3/5 rating based on 10 customer reviews. They are well-regarded by their customers.

How long has Florida Power Services been in business?

Florida Power Services was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Florida Power Services

Fill in your details and we'll connect you with Florida Power Services.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote