FE

Fresh Electrical Solar

One of the UK's largest solar installation companies with 4-star Trustpilot rating and 549 reviews, based in Basildon

Basildon, UK
4 (549 reviews)
Verified
Residential Commercial

10+

Years in Business

0

549

Customer Reviews

80 km

Service Area

51-200

Employees

SurgePV Score

7.9 / 10
Customer Reviews
80%
Certifications
75%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Fresh Electrical Solar

Fresh Electrical Solar (trading as Fresh Solar UK) is one of the UK’s larger dedicated solar installation companies, operating from Orion Court, 2-3 Cranes Farm Road, Basildon, Essex SS14 3DB. The company was incorporated in March 2016 and has grown to become a well-established Essex-based installer with thousands of residential and commercial solar PV systems installed across the UK.

Fresh Electrical Solar is MCS certified and a member of the Renewable Energy Consumer Code (RECC). The company installs premium solar panels from manufacturers including QCells and Meyer Burger, with an emphasis on high-efficiency modules for residential rooftops. Their Trustpilot profile holds a 4-star rating from 549 customer reviews, with customers citing punctual installation teams, informative communication, and clean workmanship.

The company offers solar panel installation, battery storage, and EV charging solutions. Their Basildon base allows them to serve customers across the whole of Essex and into neighbouring counties. Fresh Electrical Solar can be contacted by calling 01268 214801. Office hours are Monday to Friday, 09:00 to 17:00. Their scale as a business means they carry capacity for large residential projects and can offer competitive pricing through installer partnerships with panel manufacturers.

Service Area

Fresh Electrical Solar serves the following areas within a 80 km radius:

BasildonChelmsfordColchesterSouthend-on-SeaBrentwoodHarlow

Are you Fresh Electrical Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS RECC

Partner Manufacturers

Panels

QCellsMeyer Burger

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4

549 reviews

Essex homeowner

8 November 2024
Verified Customer

Punctual, efficient and informative throughout the whole process. The team explained everything about the system and the installation was completed neatly and on time.

Frequently Asked Questions About Fresh Electrical Solar

What services does Fresh Electrical Solar offer?

Fresh Electrical Solar offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Fresh Electrical Solar MCS certified?

Yes, Fresh Electrical Solar is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Fresh Electrical Solar serve?

Fresh Electrical Solar serves Basildon, Chelmsford, Colchester, Southend-on-Sea, Brentwood, Harlow. They are based in Basildon with a service radius of 80 km.

What warranty does Fresh Electrical Solar offer?

Fresh Electrical Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Fresh Electrical Solar's customer reviews?

Fresh Electrical Solar has a 4/5 rating based on 549 customer reviews. They are well-regarded by their customers.

How long has Fresh Electrical Solar been in business?

Fresh Electrical Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Fresh Electrical Solar

Fill in your details and we'll connect you with Fresh Electrical Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote