GE

Gallagher Electrical

Family-run NICEIC and MCS-approved electricians and solar installers with over 30 years of experience

Birmingham, UK
4.9 (40 reviews)
Verified
Residential Commercial

36+

Years in Business

40

Customer Reviews

60 km

Service Area

SurgePV Score

8.3 / 10
Customer Reviews
98%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
70%
Online Presence
50%

About Gallagher Electrical

Gallagher Electrical is a family-run electrical and solar installation company based at Unit 4, Darwin House, Dudley Innovation Centre in Kingswinford. Founded by John Gallagher over 30 years ago as a sole trader, the business is now run alongside his son Richard. Gallagher Electrical holds NICEIC approved contractor status and MCS certification for solar PV installations.

The company serves residential and commercial customers across Birmingham, the Black Country, and the wider West Midlands. Their core services include solar panel installation, battery storage, EV charge points, and general electrical work. With their deep electrical expertise, the team handles all aspects of a solar installation in-house, from initial survey and system design through to grid connection and handover.

As an MCS-certified installer, Gallagher Electrical’s solar systems qualify for the Smart Export Guarantee and 0% VAT on domestic installations. Their long track record in the electrical trade gives them practical expertise in consumer unit upgrades, wiring configurations, and fault diagnosis that newer entrants may lack. The company has earned consistently positive reviews for professional workmanship, clear communication, and tidy installations.

Service Area

Gallagher Electrical serves the following areas within a 60 km radius:

BirminghamKingswinfordDudleyWolverhamptonWalsallWest Bromwich

Are you Gallagher Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS NICEIC

Warranty Coverage

Panel Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

40 reviews

Kingswinford Homeowner

25 October 2025
Verified Customer

Their on-site survey and system design suggestions were a breath of fresh air. The team were efficient, tidy and courteous throughout the installation.

Black Country Customer

14 August 2025
Verified Customer

Excellent service from a genuine family business. John and Richard clearly know their trade. Solar panels installed quickly with no mess. Very happy with the results.

Frequently Asked Questions About Gallagher Electrical

What services does Gallagher Electrical offer?

Gallagher Electrical offers Solar Installation, Battery Storage, EV Charging.

Is Gallagher Electrical MCS certified?

Yes, Gallagher Electrical is MCS certified and also holds NICEIC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Gallagher Electrical serve?

Gallagher Electrical serves Birmingham, Kingswinford, Dudley, Wolverhampton, Walsall, West Bromwich. They are based in Birmingham with a service radius of 60 km.

What warranty does Gallagher Electrical offer?

Gallagher Electrical offers 25-year panel warranty, and 10-year installation/workmanship warranty.

How are Gallagher Electrical's customer reviews?

Gallagher Electrical has a 4.9/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Gallagher Electrical been in business?

Gallagher Electrical was founded in 1990 and has been in business for 36 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Gallagher Electrical

Fill in your details and we'll connect you with Gallagher Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote