GG

Geo Green Power (Bath)

10+ year renewable energy installer with 4.9-star Trustpilot rating serving Bath and South West

Bath, UK
4.9 (169 reviews)
Verified
Residential Commercial

13+

Years in Business

0

169

Customer Reviews

120 km

Service Area

11-50

Employees

SurgePV Score

8.3 / 10
Customer Reviews
98%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
100%

About Geo Green Power (Bath)

Geo Green Power is a renewable energy installer headquartered at Unit A, Bradmore Business Park, Bunny, Nottingham, NG11 6QA. The company serves Bath and the South West as part of its national coverage, and has been operating for over 10 years since founding in 2013. Geo Green Power installs solar PV, battery storage, and EV charging points for residential and commercial customers.

The company holds MCS certification and holds a 4.9-star Trustpilot rating from 169 reviews, with customer feedback consistently praising professional conduct, fast communication, and quality installations. The company’s autumn 2024 newsletter reported reaching a 4.7 TrustScore milestone as a result of sustained positive feedback during that period.

Geo Green Power covers Bath and the surrounding South West region, offering free site surveys and bespoke system designs. Customers can contact the team on 0800 988 3188 or through the inquiry form at geogreenpower.com. The company’s experience with both domestic and commercial properties makes it suitable for Bath homeowners and local businesses looking for a well-reviewed national installer with strong customer service credentials.

Note: Geo Green Power’s registered office is in Nottingham; Bath customers are served by regional engineers rather than a local Bath branch.

Service Area

Geo Green Power (Bath) serves the following areas within a 120 km radius:

BathBristolSwindonCheltenhamOxfordGloucester

Are you Geo Green Power (Bath)?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

169 reviews

Verified Trustpilot Customer

1 October 2024
Verified Customer

Very professional throughout and fast communication from the team. Excellent installation and would definitely recommend.

Verified Trustpilot Customer

15 June 2024
Verified Customer

Helpful and clear from the very first call. The system was designed exactly to our needs and the installation team were tidy and efficient.

Frequently Asked Questions About Geo Green Power (Bath)

What services does Geo Green Power (Bath) offer?

Geo Green Power (Bath) offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Geo Green Power (Bath) MCS certified?

Yes, Geo Green Power (Bath) is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Geo Green Power (Bath) serve?

Geo Green Power (Bath) serves Bath, Bristol, Swindon, Cheltenham, Oxford, Gloucester. They are based in Bath with a service radius of 120 km.

What warranty does Geo Green Power (Bath) offer?

Geo Green Power (Bath) offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Geo Green Power (Bath)'s customer reviews?

Geo Green Power (Bath) has a 4.9/5 rating based on 169 customer reviews. Customers consistently rate them highly.

How long has Geo Green Power (Bath) been in business?

Geo Green Power (Bath) was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Geo Green Power (Bath)

Fill in your details and we'll connect you with Geo Green Power (Bath).

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote