Geo Green Power
MCS and NICEIC-certified commercial solar installer with over 14 years experience serving Bournemouth businesses
2026+
Years in Business
80 km
Service Area
11-50
Employees
SurgePV Score
About Geo Green Power
Geo Green Power is a commercial renewable energy installer that serves businesses in Bournemouth and the surrounding coastal region. The company has over 14 years of experience in the renewable energy sector and holds MCS, NICEIC, CHAS, IET, and RECC certifications. Their in-house team manages every aspect of commercial solar projects, from initial site survey through to installation, commissioning, and ongoing maintenance.
The company works with businesses across Bournemouth, including those at Bournemouth Airport Business Park, Mallard Road Retail Park, and Aviation Business Park. Sectors served include hospitality, retail, offices, and industrial premises. In addition to solar PV, the company provides solar carports, EV charging infrastructure, and battery storage solutions.
Geo Green Power can be reached at their freephone number (+44 800 988 3188) or by email at [email protected]. Their national headquarters number is +44 1509 880 199. All commercial projects are managed by a dedicated project team and supported by the company’s renewable energy specialists, who assist businesses in meeting net-zero targets and reducing operating costs.
Service Area
Geo Green Power serves the following areas within a 80 km radius:
Contact Information
Are you Geo Green Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Geo Green Power
What services does Geo Green Power offer?
Geo Green Power offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.
Is Geo Green Power MCS certified?
Yes, Geo Green Power is MCS certified and also holds NICEIC, CHAS, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Geo Green Power serve?
Geo Green Power serves Bournemouth, Poole, Christchurch, Southampton, Dorset. They are based in Bournemouth with a service radius of 80 km.
What warranty does Geo Green Power offer?
Geo Green Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Geo Green Power's customer reviews?
Geo Green Power does not have any reviews yet. Be the first to leave a review after using their services.
How long has Geo Green Power been in business?
Geo Green Power was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Bournemouth
Get a Free Solar Quote from Geo Green Power
Fill in your details and we'll connect you with Geo Green Power.
Quote request sent!
Geo Green Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile