GG

Geo Green Power

MCS certified commercial solar specialists serving Swindon and the South West — established 2010, 70+ staff nationwide

Swindon, UK
4.9 (172 reviews)
Verified
Commercial Industrial

16+

Years in Business

0

172

Customer Reviews

100 km

Service Area

51-200

Employees

SurgePV Score

8.7 / 10
Customer Reviews
98%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Geo Green Power

Geo Green Power is headquartered at Unit A, Bradmore Business Park, Bunny, Nottingham, NG11 6QA, with a dedicated commercial solar service covering Swindon and the wider South West region. Founded in 2010 with a team of two, the company has grown to more than 70 staff across the UK.

Geo Green Power is MCS certified and ISO 9001 accredited, ensuring installations are delivered to a consistently high standard. The company specialises in high-performance commercial solar solutions, covering project scoping, system design, installation, commissioning, and long-term monitoring and maintenance. Their dedicated Swindon page at geogreenpower.com/commercial-solar-installers-swindon/ covers the commercial solar market in the region.

All field operatives hold CSCS/ECS cards, Working at Heights certification, Asbestos Awareness, and First Aid as minimum requirements. Geo Green Power can be reached on 0800 988 3188 or by email at [email protected], and serves Swindon, Bristol, Bath, Chippenham, Oxford, Gloucester, and Cardiff.

Service Area

Geo Green Power serves the following areas within a 100 km radius:

SwindonBristolBathChippenhamOxfordGloucesterCardiff

Are you Geo Green Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Monitoring
Maintenance

Certifications & Accreditations

MCS ISO9001

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Geo Green Power

What services does Geo Green Power offer?

Geo Green Power offers Solar Installation, Battery Storage, Monitoring, Maintenance.

Is Geo Green Power MCS certified?

Yes, Geo Green Power is MCS certified and also holds ISO9001 certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Geo Green Power serve?

Geo Green Power serves Swindon, Bristol, Bath, Chippenham, Oxford, Gloucester, Cardiff. They are based in Swindon with a service radius of 100 km.

What warranty does Geo Green Power offer?

Geo Green Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Geo Green Power's customer reviews?

Geo Green Power has a 4.9/5 rating based on 172 customer reviews. Customers consistently rate them highly.

How long has Geo Green Power been in business?

Geo Green Power was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Geo Green Power

Fill in your details and we'll connect you with Geo Green Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote