Geoscape Solar
New Jersey's premier solar provider for residential, commercial, and nonprofit projects since 2008
18+
Years in Business
76
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Geoscape Solar
Geoscape Solar LLC is a solar installation company headquartered at 30A Vreeland Road, Suite 130, in Florham Park, New Jersey, with additional offices in Mount Laurel and central New Jersey. Founded in 2008, Geoscape serves residential, commercial, and nonprofit customers throughout the state, including the Newark metro area. The company designs, installs, finances, and maintains solar electric systems with multiple ownership options including purchase, lease, operating lease, PPA, and 1.99% financing.
Led by CEO Michael Boches, Geoscape Solar has grown into one of New Jersey’s most experienced solar providers with nearly two decades of installations across the state. The company is a member of the Alliance for PACE in New Jersey and participates in the state’s community solar programs. Geoscape handles the complete project cycle from site assessment and engineering design through permitting, construction, and utility interconnection.
Geoscape Solar holds an A+ BBB rating and a 4.4-star expert rating across review platforms. Customers praise the company’s financing flexibility, with multiple ownership structures that allow both homeowners and commercial property owners to go solar with little or no upfront cost. The company’s strong presence in North, South, and Central New Jersey gives Newark-area customers convenient access to experienced local solar professionals.
Service Area
Geoscape Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Geoscape Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.4
76 reviews
Catherine L.
Geoscape Solar designed a system that fits our roof perfectly and the output has matched their estimates exactly. The whole team from sales to installation was professional and thorough.
Brian F.
We went with Geoscape for our nonprofit's solar project. They were incredibly knowledgeable about the incentives available to us and the system is already saving our organization thousands per year.
Pamela D.
Good solar company with experienced staff. The installation was clean and the system works well. Would have appreciated slightly faster response times during the post-installation monitoring setup.
Frequently Asked Questions About Geoscape Solar
What services does Geoscape Solar offer?
Geoscape Solar offers Solar Installation, Solar Design, Maintenance, Monitoring.
Is Geoscape Solar NABCEP certified?
Geoscape Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Geoscape Solar serve?
Geoscape Solar serves Newark, Florham Park, Mount Laurel, Morristown, Princeton, Cherry Hill, Trenton. They are based in Newark with a service radius of 120 km.
What warranty does Geoscape Solar offer?
Geoscape Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Geoscape Solar's customer reviews?
Geoscape Solar has a 4.4/5 rating based on 76 customer reviews. They are well-regarded by their customers.
How long has Geoscape Solar been in business?
Geoscape Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Newark
Get a Free Solar Quote from Geoscape Solar
Fill in your details and we'll connect you with Geoscape Solar.
Quote request sent!
Geoscape Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile