Go Solar Power
Full-service solar, Tesla Powerwall, and EV charger installer serving Birmingham homeowners and businesses
7+
Years in Business
7
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About Go Solar Power
Go Solar Power is a Service Experts company offering solar panel installation, Tesla Powerwall battery storage, and EV charger installation across eight states including Alabama. The company operates a Birmingham office at 420 N 20th Street, serving residential and commercial customers throughout the greater Birmingham metro area.
Go Solar Power provides end-to-end solar solutions from initial consultation and system design through permitting, installation, and utility interconnection. The company is a Tesla Powerwall Certified Installer, allowing customers to pair rooftop solar with battery storage for backup power and energy independence. Go Solar Power also installs EV charging stations as part of a comprehensive home energy package.
The Birmingham office serves homeowners and businesses in Hoover, Vestavia Hills, Homewood, Pelham, Alabaster, and Trussville. Go Solar Power offers free consultations and system designs tailored to each property’s roof orientation, shading conditions, and energy consumption profile.
Service Area
Go Solar Power serves the following areas within a 93-mile radius:
Contact Information
Are you Go Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Batteries
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.2
7 reviews
Verified Customer
Go Solar Power made the entire process straightforward. They handled permits, installation, and interconnection with Alabama Power. The Tesla Powerwall gives us backup power during storms, which is a major benefit in our area.
Verified Customer
Good experience from consultation through installation. The system is performing as quoted and we are seeing real savings on our monthly electricity bill. Would recommend for anyone in the Birmingham area.
Verified Customer
Professional installation team and a clean job site. The EV charger was installed at the same time as our solar panels, which saved us from scheduling a second appointment.
Frequently Asked Questions About Go Solar Power
What services does Go Solar Power offer?
Go Solar Power offers Solar Installation, Battery Storage, EV Charging.
Is Go Solar Power NABCEP certified?
Go Solar Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Go Solar Power serve?
Go Solar Power serves Birmingham, Hoover, Vestavia Hills, Homewood, Pelham, Alabaster, Trussville. They are based in Birmingham with a service radius of 150 km.
What warranty does Go Solar Power offer?
Go Solar Power offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Go Solar Power's customer reviews?
Go Solar Power has a 4.2/5 rating based on 7 customer reviews. They are well-regarded by their customers.
How long has Go Solar Power been in business?
Go Solar Power was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Birmingham
Get a Free Solar Quote from Go Solar Power
Fill in your details and we'll connect you with Go Solar Power.
Quote request sent!
Go Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile