GS

Grape Solar

Eugene-based solar manufacturer and installer providing grid-tied, off-grid, and commercial solar systems since 2009

Eugene, Oregon
4.5 (16 reviews)
Verified
Residential Commercial off-grid

17+

Years in Business

0

16

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

8.4 / 10
Customer Reviews
90%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Grape Solar

Grape Solar is a solar energy manufacturer and installation company headquartered at 2635 W 7th Place in Eugene, Oregon. Founded in 2009 (formerly known as Centron Solar), Grape Solar is a full-service solar company offering grid-tied, off-grid, and commercial solar energy systems, along with solar kits, panels, controllers, inverters, and accessories.

The company has a pioneering track record distributing solar panels and related products to the world’s largest big-box retailers, wholesalers, and electrical specialty stores across more than 10,000 locations in all 50 U.S. states. Grape Solar manufactures its own solar panels and provides both DIY solar kits and professional installation services.

Grape Solar holds a 4.5-star rating from 16 Google reviews, with customers praising the knowledgeable staff, passionate approach to solar education, and reliable off-grid system performance. The company can be reached at (541) 349-9000 or toll-free at (877) 264-1014.

Service Area

Grape Solar serves the following areas within a 93-mile radius:

EugeneSpringfieldPortlandSalem

Are you Grape Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Grid Connection

Certifications & Accreditations

Oregon Contractor License

Partner Manufacturers

Panels

Grape Solar

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

16 reviews

Joshua R.

18 September 2025
Verified Customer

Joshua at Grape Solar provided incredible customer service and guided us through the entire installation process. The system is performing great.

Maria L.

22 July 2025
Verified Customer

Staff was pleasant, knowledgeable and passionate about solar. They designed a system that fits our budget and energy needs perfectly.

Frank H.

10 May 2025
Verified Customer

Have had two Grape Solar kits installed for over four years and living completely off-grid. No problems even on cloudy Oregon days.

Frequently Asked Questions About Grape Solar

What services does Grape Solar offer?

Grape Solar offers Solar Installation, Solar Design, Grid Connection.

Is Grape Solar NABCEP certified?

Grape Solar holds the following certifications: Oregon Contractor License. Contact them directly for the latest accreditation details.

What areas does Grape Solar serve?

Grape Solar serves Eugene, Springfield, Portland, Salem. They are based in Eugene with a service radius of 150 km.

What warranty does Grape Solar offer?

Grape Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Grape Solar's customer reviews?

Grape Solar has a 4.5/5 rating based on 16 customer reviews. Customers consistently rate them highly.

How long has Grape Solar been in business?

Grape Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Grape Solar

Fill in your details and we'll connect you with Grape Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote