Green Building Renewables (Daventry)
Award-winning MCS certified solar, battery storage, heat pump, and EV charger installer covering Northampton and Daventry
10+
Years in Business
305
Customer Reviews
60 km
Service Area
51-200
Employees
SurgePV Score
About Green Building Renewables (Daventry)
Green Building Renewables operates a Daventry office at 3A Brunel Close, Daventry, Northamptonshire NN11 8RB, and also has a Northampton location at 20a-30 Abington Street, Northampton NN1 2AJ. Phone: 01327 228346. The Daventry office was originally established as Bright Green Renewables and rebranded as part of the Green Building Renewables group in February 2022, following the company’s founding by Chris Delaney and John Gilham in 2016.
The company is part of the 21° Group, a UK-wide network of renewable energy installers. This group structure allows the Daventry team to combine local knowledge and personal service with the purchasing power and technical resource of a larger organisation. Green Building Renewables employs its own trained engineers rather than subcontracting, which the company states helps maintain consistent quality and customer service standards.
Certifications held include MCS, RECC (Renewable Energy Consumer Code), NICEIC (electrical), and TrustMark registration. Services span solar PV installation, battery storage, EV charging points, air source heat pumps, and ground source heat pumps. The Daventry office serves Northampton, Daventry, Leamington Spa, Banbury, Brackley, Leicester, and Milton Keynes.
Green Building Renewables has a 4.0-star Trustpilot rating with over 305 reviews across all branches, including 72 reviews for the Daventry location specifically. The company has achieved a 4.9 rating for its overall Trustpilot presence and received multiple industry awards. A two-year workmanship warranty is provided on all installations. All solar systems come with a 25-year performance guarantee on panels.
Service Area
Green Building Renewables (Daventry) serves the following areas within a 60 km radius:
Contact Information
Are you Green Building Renewables (Daventry)?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4
305 reviews
Customer via Trustpilot
Extremely pleased with the professional and efficient service. The team was very tidy and completed the installation on time and within budget.
Frequently Asked Questions About Green Building Renewables (Daventry)
What services does Green Building Renewables (Daventry) offer?
Green Building Renewables (Daventry) offers Solar Installation, Battery Storage, EV Charging.
Is Green Building Renewables (Daventry) MCS certified?
Yes, Green Building Renewables (Daventry) is MCS certified and also holds RECC, NICEIC, TrustMark certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Green Building Renewables (Daventry) serve?
Green Building Renewables (Daventry) serves Northampton, Daventry, Leicester, Milton Keynes, Brackley, Leamington Spa, Banbury. They are based in Northampton with a service radius of 60 km.
What warranty does Green Building Renewables (Daventry) offer?
Green Building Renewables (Daventry) offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Building Renewables (Daventry)'s customer reviews?
Green Building Renewables (Daventry) has a 4/5 rating based on 305 customer reviews. They are well-regarded by their customers.
How long has Green Building Renewables (Daventry) been in business?
Green Building Renewables (Daventry) was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Northampton
Get a Free Solar Quote from Green Building Renewables (Daventry)
Fill in your details and we'll connect you with Green Building Renewables (Daventry).
Quote request sent!
Green Building Renewables (Daventry) will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile