Green Energy Solar
MCS, HIES and NAPIT-accredited solar installer with a 4.9-star rating serving Swansea and South Wales
12+
Years in Business
122
Customer Reviews
60 km
Service Area
11-50
Employees
SurgePV Score
About Green Energy Solar
Green Energy Solar is a solar PV installation company based at Unit T3, Capital Business Park, Cardiff, serving Swansea, Newport, Cardiff, and the wider South Wales and Bristol areas. With over 10 years of experience in the solar industry, the company employs in-house installation teams and does not subcontract, providing direct quality control on every project.
The company holds MCS, HIES, and NAPIT accreditations and is an approved installer for the Solar Together Wales scheme. Green Energy Solar designs, installs, monitors, and repairs bespoke solar PV systems for residential and commercial customers, pairing installations with Tesla Powerwall battery storage where required. All installation work qualifies customers for the Smart Export Guarantee.
Green Energy Solar holds a 4.9-star combined rating from 122 reviews on Trustpilot and Birdeye, and a perfect 10/10 score from 49 reviews on Checkatrade. Customers across Swansea and South Wales consistently praise the installation teams — named in reviews as Joel, Steve, Scott, Rhys, and Gethin — for professional workmanship, clear communication, and tidy, well-managed projects.
Service Area
Green Energy Solar serves the following areas within a 60 km radius:
Contact Information
Are you Green Energy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
122 reviews
Verified Customer
Absolutely delighted with the service and high standard of work from Joel, Steve and the Green Energy Solar team! From initial enquiry through to technical installation this company has been super impressive.
Verified Customer
Two of my student properties have had new roofs, solar panels and batteries installed by Green Energy Solar, and we've been very happy with their work. I highly recommend them as a company.
Frequently Asked Questions About Green Energy Solar
What services does Green Energy Solar offer?
Green Energy Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is Green Energy Solar MCS certified?
Yes, Green Energy Solar is MCS certified and also holds HIES, NAPIT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Green Energy Solar serve?
Green Energy Solar serves Swansea, Cardiff, Newport, Bridgend, Neath, Bristol. They are based in Swansea with a service radius of 60 km.
What warranty does Green Energy Solar offer?
Green Energy Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Energy Solar's customer reviews?
Green Energy Solar has a 4.9/5 rating based on 122 customer reviews. Customers consistently rate them highly.
How long has Green Energy Solar been in business?
Green Energy Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in Swansea
Get a Free Solar Quote from Green Energy Solar
Fill in your details and we'll connect you with Green Energy Solar.
Quote request sent!
Green Energy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile