HE

Hassie Electrical

MCS and NAPIT-certified solar PV and Tesla Powerwall installer serving Swansea and South Wales

Swansea, UK
5 (12 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

12

Customer Reviews

50 km

Service Area

2-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
100%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Hassie Electrical

Hassie Electrical Ltd is an established solar PV installation company based at 16 Maes y Wawr, Birchgrove, Swansea, SA7 0HL. The company is situated on the outskirts of Swansea and serves customers across South Wales. Hassie Electrical holds both MCS and NAPIT accreditations and is fully qualified to install Tesla Powerwall battery storage systems.

The company provides domestic and commercial solar PV installation, battery storage, and maintenance services. Contact details include phone numbers 07891 311862 and 01554 811990, and email at [email protected]. The company is listed on the Discover Solar MCS Installer Directory, the Renewable Energy Hub, and ENF Solar as a verified solar installer in Swansea.

Customer reviews across platforms including Quotatis and CompareMySolar highlight Hassie Electrical for their professionalism, technical knowledge, competitive pricing, and reliable communication. Customers consistently recommend the company for solar PV installations in South Wales.

Service Area

Hassie Electrical serves the following areas within a 50 km radius:

SwanseaNeathPort TalbotBridgendCarmarthen

Are you Hassie Electrical?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS NAPIT

Partner Manufacturers

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

12 reviews

Verified Customer

15 March 2025
Verified Customer

Very impressed with the professionalism and quality of workmanship. We would highly recommend David and his team.

Verified Customer

20 January 2024
Verified Customer

Had my solar installed by Hassie Electrical and they were excellent, no fuss and really professional. I would highly recommend them. Best price, knowledgeable, good communications and reliable.

Frequently Asked Questions About Hassie Electrical

What services does Hassie Electrical offer?

Hassie Electrical offers Solar Installation, Battery Storage, Maintenance.

Is Hassie Electrical MCS certified?

Yes, Hassie Electrical is MCS certified and also holds NAPIT certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Hassie Electrical serve?

Hassie Electrical serves Swansea, Neath, Port Talbot, Bridgend, Carmarthen. They are based in Swansea with a service radius of 50 km.

What warranty does Hassie Electrical offer?

Hassie Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Hassie Electrical's customer reviews?

Hassie Electrical has a 5/5 rating based on 12 customer reviews. Customers consistently rate them highly.

How long has Hassie Electrical been in business?

Hassie Electrical was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Hassie Electrical

Fill in your details and we'll connect you with Hassie Electrical.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote