Green Ridge Solar
BBB-accredited Oregon solar installer with fast installation timelines and 4.7-star customer ratings
10+
Years in Business
167
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Green Ridge Solar
Green Ridge Solar is a local Oregon solar installation company headquartered at 15205 SW Arrow St in Sherwood, serving the Portland metro area and communities throughout Oregon and Washington. Founded in 2016, the company specializes in residential solar PV systems and battery storage installations.
Green Ridge Solar is known for fast installation timelines, often completing projects within one to two weeks from contract signing. The company handles all aspects of solar projects including system design, permitting, installation, and utility interconnection. Pricing typically ranges from $2.90 to $3.60 per watt.
Green Ridge Solar has been BBB Accredited since March 2019 with an A+ rating. The company holds a 4.7-star rating with 167 reviews on Birdeye, making it one of the most-reviewed solar installers in the Portland area. Customers consistently praise the company’s professionalism, reliability, and quality workmanship. Office hours are Monday through Friday, 9:00 AM to 5:00 PM.
Service Area
Green Ridge Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Green Ridge Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
167 reviews
Sherwood Homeowner
Green Ridge Solar was professional and reliable from start to finish. Excellent communication and workmanship during the installation process.
Tigard Customer
Fast installation, just about two weeks from contract to completion. The team was knowledgeable and the pricing was competitive for the area.
Portland Resident
Quality installation and good customer service. System has been performing well since commissioning. Would recommend to neighbors.
Frequently Asked Questions About Green Ridge Solar
What services does Green Ridge Solar offer?
Green Ridge Solar offers Solar Installation, Battery Storage, system_design.
Is Green Ridge Solar NABCEP certified?
Green Ridge Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Green Ridge Solar serve?
Green Ridge Solar serves Portland, Sherwood, Tigard, Tualatin, Beaverton, Salem. They are based in Portland with a service radius of 100 km.
What warranty does Green Ridge Solar offer?
Green Ridge Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Ridge Solar's customer reviews?
Green Ridge Solar has a 4.7/5 rating based on 167 customer reviews. Customers consistently rate them highly.
How long has Green Ridge Solar been in business?
Green Ridge Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Portland
Get a Free Solar Quote from Green Ridge Solar
Fill in your details and we'll connect you with Green Ridge Solar.
Quote request sent!
Green Ridge Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile