Green Wave Solar
NABCEP-certified and award-winning solar installer serving the TVA region with residential and commercial solutions
2026+
Years in Business
33
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About Green Wave Solar
Green Wave Solar is a NABCEP-certified solar installation company based at 231 West Rutherford Boulevard, Murfreesboro, TN 37130, serving the Tennessee Valley Authority region including Huntsville and North Alabama. The company won the 2023 RE+ Installer of the Year award and the TBA Quality Contractor Network Award.
Green Wave Solar provides residential and commercial solar energy solutions across the TVA region, which extends into North Alabama. The NABCEP-certified team handles every aspect of solar installation from initial consultation and system design through permitting, installation, and ongoing support.
The company specializes in delivering sustainable solar solutions tailored to the TVA service territory, helping homeowners and businesses across Huntsville, Madison County, and the surrounding region reduce energy costs with clean solar power.
Service Area
Green Wave Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Green Wave Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
33 reviews
Verified Customer
Green Wave Solar was amazing from start to finish. Their NABCEP certification gave us confidence and the installation quality was excellent. System is producing more than expected.
Verified Customer
Award-winning company for a reason. Green Wave handled our commercial solar project professionally and the energy savings have been substantial.
Verified Customer
Good experience with Green Wave Solar. They designed a system that works well for our home in the TVA service area. Professional and responsive team.
Frequently Asked Questions About Green Wave Solar
What services does Green Wave Solar offer?
Green Wave Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection.
Is Green Wave Solar NABCEP certified?
Green Wave Solar holds the following certifications: NABCEP Certified, 2023 RE+ Installer of the Year. Contact them directly for the latest accreditation details.
What areas does Green Wave Solar serve?
Green Wave Solar serves Huntsville, Madison, Decatur, Nashville, Murfreesboro, Chattanooga. They are based in Huntsville with a service radius of 200 km.
What warranty does Green Wave Solar offer?
Green Wave Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Wave Solar's customer reviews?
Green Wave Solar has a 4.8/5 rating based on 33 customer reviews. Customers consistently rate them highly.
How long has Green Wave Solar been in business?
Green Wave Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Huntsville
Get a Free Solar Quote from Green Wave Solar
Fill in your details and we'll connect you with Green Wave Solar.
Quote request sent!
Green Wave Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile