Harrimans Solar Energy Solutions
Licensed solar and electrical contractor with over 50 years in business and 30,000+ customers served
57+
Years in Business
17
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Harrimans Solar Energy Solutions
Harrimans Solar Energy Solutions is a full-service solar and electrical contractor headquartered at 140 James St, Venice, FL 34285, serving the greater Sarasota and Southwest Florida region. Founded in 1969, the company has over 50 years in business and has served more than 30,000 customers as a licensed, state-certified commercial and residential solar and electrical contractor.
Harrimans holds State Certified Solar Contractor, Electrical Contractor, and Pool/Spa Contractor licenses (CVC056634) issued by the Florida Department of Business and Professional Regulation, along with a BBB A+ rating. The company is an all-inclusive contractor that handles solar system design, roof measurements, engineering, permitting, installation, and final inspection entirely in-house without subcontractors. Harrimans maintains three local phone lines for Sarasota/Bradenton (941-366-6680), Venice/Englewood (941-488-4453), and Port Charlotte/Punta Gorda (941-743-4315).
The company has a BuildZoom score of 101, ranking in the top 12% of Florida licensed contractors. Harrimans holds a 4.7-star rating from 17 reviews on Yelp and has been serving the Sarasota, Venice, Bradenton, Englewood, Port Charlotte, and Punta Gorda areas for over five decades.
Service Area
Harrimans Solar Energy Solutions serves the following areas within a 62-mile radius:
Contact Information
Are you Harrimans Solar Energy Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
17 reviews
Verified Customer
Harrimans handled everything from roof measurements to final inspection. No subcontractors, just their own team. Professional and thorough throughout the entire process.
Verified Customer
With over 50 years in business there is a reason Harrimans is still going strong. Quality installation, honest pricing, and they stand behind their work.
Verified Customer
Good experience overall with Harrimans. The solar system was installed on time and the battery backup has already proven its value during hurricane season.
Frequently Asked Questions About Harrimans Solar Energy Solutions
What services does Harrimans Solar Energy Solutions offer?
Harrimans Solar Energy Solutions offers Solar Installation, Battery Storage, Maintenance.
Is Harrimans Solar Energy Solutions NABCEP certified?
Harrimans Solar Energy Solutions holds the following certifications: State Certified Solar Contractor, State Certified Electrical Contractor, State Certified Pool/Spa Contractor, BBB A+ Rating. Contact them directly for the latest accreditation details.
What areas does Harrimans Solar Energy Solutions serve?
Harrimans Solar Energy Solutions serves Sarasota, Venice, Bradenton, Englewood, Port Charlotte, Punta Gorda, North Port. They are based in Sarasota with a service radius of 100 km.
What warranty does Harrimans Solar Energy Solutions offer?
Harrimans Solar Energy Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Harrimans Solar Energy Solutions's customer reviews?
Harrimans Solar Energy Solutions has a 4.7/5 rating based on 17 customer reviews. Customers consistently rate them highly.
How long has Harrimans Solar Energy Solutions been in business?
Harrimans Solar Energy Solutions was founded in 1969 and has been in business for 57 years. They are one of the more experienced solar installers in their area.
Similar Installers in Sarasota
Get a Free Solar Quote from Harrimans Solar Energy Solutions
Fill in your details and we'll connect you with Harrimans Solar Energy Solutions.
Quote request sent!
Harrimans Solar Energy Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile