HS

Home Solar CT

NABCEP-certified Connecticut solar provider offering 24/7 availability and flexible financing options

Hartford, Connecticut
4.7 (60 reviews)
Verified
Residential

8+

Years in Business

400+

Projects Completed

60

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

7.9 / 10
Customer Reviews
94%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
50%

About Home Solar CT

Home Solar CT is a residential solar installation company based at 138 Belden Street in Watertown, Connecticut, serving homeowners across the greater Hartford area and western Connecticut. The company employs a team of licensed electricians and NABCEP-certified installers who specialize in designing and installing custom solar panel systems for Connecticut homes.

Home Solar CT offers free consultations and solar assessments, with availability seven days a week. The company works with Qcells panels and Enphase microinverters, and provides Tesla Powerwall battery storage for homeowners seeking backup power. Their team handles the full installation process including site evaluation, system design, permitting, installation, and utility interconnection.

The company offers flexible financing options including solar loans and leasing arrangements. Home Solar CT focuses on educating homeowners about their solar options and provides transparent pricing with no hidden costs. Their customer support team is available to assist with monitoring questions and maintenance needs throughout the life of the system.

Service Area

Home Solar CT serves the following areas within a 62-mile radius:

HartfordWest HartfordWatertownWaterburyNew BritainTorringtonBristolLitchfield

Are you Home Solar CT?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

Qcells

Inverters

Enphase

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

60 reviews

Laura H.

15 November 2025
Verified Customer

Home Solar CT was available when I needed them. I called on a Sunday and someone actually answered. Their team designed a system that fit our budget and the installation was completed quickly and professionally.

Jeff W.

3 August 2025
Verified Customer

Straightforward process and honest pricing. No hidden fees or surprises. The installers were licensed electricians and knew exactly what they were doing. Our system has been performing well.

Barbara N.

20 May 2025
Verified Customer

Good company with responsive customer service. The installation went smoothly and the system is generating electricity as projected. They helped us understand all the financing options clearly.

Frequently Asked Questions About Home Solar CT

What services does Home Solar CT offer?

Home Solar CT offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection.

Is Home Solar CT NABCEP certified?

Yes, Home Solar CT is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Home Solar CT serve?

Home Solar CT serves Hartford, West Hartford, Watertown, Waterbury, New Britain, Torrington, Bristol, Litchfield. They are based in Hartford with a service radius of 100 km.

What warranty does Home Solar CT offer?

Home Solar CT offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Home Solar CT's customer reviews?

Home Solar CT has a 4.7/5 rating based on 60 customer reviews. Customers consistently rate them highly.

How long has Home Solar CT been in business?

Home Solar CT was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Home Solar CT

Fill in your details and we'll connect you with Home Solar CT.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote