Huston Solar
Division of Huston Electric serving central Indiana with commercial and residential solar since 1939
87+
Years in Business
30
Customer Reviews
93 mi
Service Area
51-200
Employees
SurgePV Score
About Huston Solar
Huston Solar is a division of Huston Electric Inc, a family-owned electrical contracting company that has served central Indiana since 1939. With physical offices in Westfield, Kokomo, Lafayette, and West Lafayette, Huston Solar provides commercial and residential solar panel installations across the Greater Indianapolis area and throughout Indiana. The company ranks among Indiana’s top residential solar companies.
Drawing on over 80 years of electrical contracting expertise, Huston Solar delivers turnkey solar solutions including site assessment, system design, installation, and ongoing maintenance. The company handles projects ranging from small residential rooftop systems to large commercial and institutional installations for schools, businesses, and farms. Huston Solar’s deep electrical background ensures that all wiring, inverter connections, and grid interconnections meet or exceed code requirements.
Huston Solar maintains positive ratings across review platforms, with customers praising the company’s reliability, technical expertise, and straightforward communication. The company’s established infrastructure and long operational history provide homeowners and businesses with confidence in long-term warranty support and service availability.
Service Area
Huston Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Huston Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
30 reviews
Brian T.
Huston Solar installed a 25 kW system on our commercial building. Their electrical expertise from decades in the industry was evident in the quality of work. Clean installation, professional crew, and great follow-up.
Linda G.
We chose Huston because of their long history in Indiana. The team was knowledgeable and handled everything from design to final inspection. Our residential system has been performing above estimates for six months.
Steve H.
Solid company with deep roots in the community. The solar installation on our farm went smoothly. They were upfront about timelines and costs. The only reason for 4 stars is the initial wait time for the consultation.
Frequently Asked Questions About Huston Solar
What services does Huston Solar offer?
Huston Solar offers Solar Installation, Solar Design, Commercial Solar, Maintenance, Monitoring.
Is Huston Solar NABCEP certified?
Huston Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Huston Solar serve?
Huston Solar serves Indianapolis, Westfield, Carmel, Kokomo, Lafayette, West Lafayette, Noblesville, Fishers. They are based in Indianapolis with a service radius of 150 km.
What warranty does Huston Solar offer?
Huston Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Huston Solar's customer reviews?
Huston Solar has a 4.6/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Huston Solar been in business?
Huston Solar was founded in 1939 and has been in business for 87 years. They are one of the more experienced solar installers in their area.
Similar Installers in Indianapolis
Get a Free Solar Quote from Huston Solar
Fill in your details and we'll connect you with Huston Solar.
Quote request sent!
Huston Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile