IT

IES Texas Solar

Full-service solar installer backed by IES Holdings, serving Texas since 2019

Fort Worth, Texas
4.5 (30 reviews)
Residential Commercial

7+

Years in Business

0

30

Customer Reviews

62 mi

Service Area

51-200

Employees

SurgePV Score

6.2 / 10
Customer Reviews
90%
Certifications
0%
Experience
70%
Services Range
60%
Warranty Coverage
63%
Online Presence
100%

About IES Texas Solar

IES Texas Solar is the solar division of IES Holdings, a publicly traded electrical infrastructure company. The DFW office is located at 250 Chandler Dr, Suite 200, Rowlett, TX 75088, and the company serves customers across Fort Worth, Dallas, San Antonio, Austin, and the broader Texas market with residential and commercial solar installations.

IES Texas Solar provides end-to-end solar panel installation and battery storage services. As a subsidiary of IES Holdings, the company has access to extensive electrical infrastructure expertise and resources, giving customers the backing of a large, established electrical contractor while maintaining the focus and specialization of a dedicated solar installer.

The company handles all aspects of solar projects from initial consultation and system design through engineering, permitting, installation, and grid interconnection. IES Texas Solar has been featured in Solar Power World and serves as one of the top-ranked solar installers on the EnergySage marketplace for the Fort Worth area.

Service Area

IES Texas Solar serves the following areas within a 62-mile radius:

Fort WorthDallasRowlettSan AntonioAustin

Are you IES Texas Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

30 reviews

Paul E.

22 October 2025
Verified Customer

IES Texas Solar provided a professional experience from quote to installation. The system was designed to maximize production for our roof orientation.

Nancy B.

14 August 2025
Verified Customer

Being backed by a large electrical company gives them the resources and expertise that smaller installers lack. Installation was completed on time and on budget.

Kevin M.

3 June 2025
Verified Customer

Solid installation and good equipment selection. The team was professional and handled all the permitting. System has been running well since day one.

Frequently Asked Questions About IES Texas Solar

What services does IES Texas Solar offer?

IES Texas Solar offers Solar Installation, Battery Storage.

Is IES Texas Solar NABCEP certified?

IES Texas Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does IES Texas Solar serve?

IES Texas Solar serves Fort Worth, Dallas, Rowlett, San Antonio, Austin. They are based in Fort Worth with a service radius of 100 km.

What warranty does IES Texas Solar offer?

IES Texas Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are IES Texas Solar's customer reviews?

IES Texas Solar has a 4.5/5 rating based on 30 customer reviews. Customers consistently rate them highly.

How long has IES Texas Solar been in business?

IES Texas Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.

Get a Free Solar Quote from IES Texas Solar

Fill in your details and we'll connect you with IES Texas Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote