Infinity Solar USA
Full-service Portland solar installer with in-house teams and 30-year system warranties
11+
Years in Business
45
Customer Reviews
62 mi
Service Area
51-100
Employees
SurgePV Score
About Infinity Solar USA
Infinity Solar USA is a solar installation company headquartered at 12545 NE Whitaker Way in Portland. Founded in 2015, the company provides residential and commercial solar energy systems across Oregon and the Pacific Northwest, handling all design, installation, and maintenance work with in-house teams using local workers.
The company differentiates itself with a 30-year warranty on solar systems, one of the longest in the industry. Infinity Solar USA is BBB Accredited with an A+ rating since April 2021. The company offers both solar PV systems and battery storage solutions, with support available through both sales and support email channels.
Infinity Solar USA maintains a 4.7-star average rating across review platforms with 45 reviews on Yelp. The company has been recognized by Solar Power World as a top solar contractor. Office hours are Monday through Friday 8:00 AM to 9:00 PM and Saturday 9:00 AM to 7:00 PM, offering extended availability compared to most competitors.
Service Area
Infinity Solar USA serves the following areas within a 62-mile radius:
Contact Information
Are you Infinity Solar USA?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
30 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
45 reviews
NE Portland Homeowner
Infinity Solar handled everything in-house from design to installation. The 30-year warranty gave us peace of mind. Professional team throughout.
Gresham Customer
Local workers, quality equipment, and a straightforward process. The system is performing well and the monitoring app works great.
Beaverton Resident
Good installation quality and responsive sales team. Project timeline was a bit longer than initially quoted but the final result is solid.
Frequently Asked Questions About Infinity Solar USA
What services does Infinity Solar USA offer?
Infinity Solar USA offers Solar Installation, Battery Storage, system_design.
Is Infinity Solar USA NABCEP certified?
Infinity Solar USA holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Infinity Solar USA serve?
Infinity Solar USA serves Portland, Beaverton, Hillsboro, Gresham, Salem. They are based in Portland with a service radius of 100 km.
What warranty does Infinity Solar USA offer?
Infinity Solar USA offers 30-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Infinity Solar USA's customer reviews?
Infinity Solar USA has a 4.7/5 rating based on 45 customer reviews. Customers consistently rate them highly.
How long has Infinity Solar USA been in business?
Infinity Solar USA was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Portland
Get a Free Solar Quote from Infinity Solar USA
Fill in your details and we'll connect you with Infinity Solar USA.
Quote request sent!
Infinity Solar USA will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile