Intelligent Design Air Conditioning, Plumbing, Solar, & Electric
Family- and veteran-owned Tucson company offering solar alongside HVAC, plumbing, and electrical since 1979
47+
Years in Business
200
Customer Reviews
50 mi
Service Area
51-100
Employees
SurgePV Score
About Intelligent Design Air Conditioning, Plumbing, Solar, & Electric
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric is a family- and veteran-owned full-service home services company founded in 1979 in Tucson, Arizona. The company operates from two locations: their main office at 1145 E Fort Lowell Rd and an east location at 3335 E Broadway Blvd. With over four decades in the home services industry, Intelligent Design expanded into solar installations to offer Tucson homeowners a one-stop solution for energy efficiency upgrades.
The company’s unique advantage is its cross-trade licensing in HVAC, plumbing, electrical, and solar. This means they can handle electrical panel upgrades, HVAC replacements, and solar installations in a single coordinated project, reducing costs and scheduling complexity for homeowners. Intelligent Design also offers EV charger installations and provides 24/7 emergency service for electrical and HVAC issues, with typical response times of one to two hours.
Intelligent Design holds a BBB A+ rating and averages 4.6 stars from approximately 200 reviews across platforms. The company’s long operating history and veteran-owned status resonate with Tucson homeowners who value established, community-rooted businesses. Their solar installations come with 25-year manufacturer warranties on panels and inverters alongside a 10-year workmanship guarantee. For homeowners planning multiple home upgrades alongside solar, Intelligent Design offers a streamlined experience that few competitors can match.
Service Area
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric serves the following areas within a 50-mile radius:
Contact Information
Are you Intelligent Design Air Conditioning, Plumbing, Solar, & Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
200 reviews
Barbara N.
Intelligent Design installed solar panels and upgraded our HVAC system at the same time. Having one company handle both services saved us time and money. The solar system has cut our electricity costs by 70%.
James F.
We needed a solar company that could also handle the electrical panel upgrade required for our system. Intelligent Design did both seamlessly since they are licensed electricians. Professional team from start to finish.
Carol T.
Good company with a wide range of services. The solar installation was done professionally and the system works well. Their 24/7 emergency service for electrical issues is a nice added benefit.
Frequently Asked Questions About Intelligent Design Air Conditioning, Plumbing, Solar, & Electric
What services does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric offer?
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Energy Audit.
Is Intelligent Design Air Conditioning, Plumbing, Solar, & Electric NABCEP certified?
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric holds the following certifications: BBB A+ Accredited, ROC Licensed. Contact them directly for the latest accreditation details.
What areas does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric serve?
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric serves Tucson, Oro Valley, Marana, Sahuarita, Green Valley, Vail, Catalina. They are based in Tucson with a service radius of 80 km.
What warranty does Intelligent Design Air Conditioning, Plumbing, Solar, & Electric offer?
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Intelligent Design Air Conditioning, Plumbing, Solar, & Electric's customer reviews?
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric has a 4.6/5 rating based on 200 customer reviews. Customers consistently rate them highly.
How long has Intelligent Design Air Conditioning, Plumbing, Solar, & Electric been in business?
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric was founded in 1979 and has been in business for 47 years. They are one of the more experienced solar installers in their area.
Similar Installers in Tucson
Get a Free Solar Quote from Intelligent Design Air Conditioning, Plumbing, Solar, & Electric
Fill in your details and we'll connect you with Intelligent Design Air Conditioning, Plumbing, Solar, & Electric.
Quote request sent!
Intelligent Design Air Conditioning, Plumbing, Solar, & Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile