Intermountain Wind & Solar
Elite-tier Utah solar installer since 2008 with residential, commercial, and off-grid expertise
18+
Years in Business
490
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Intermountain Wind & Solar
Intermountain Wind & Solar is a solar installation company headquartered at 1041 N 950 W, Suite 500, Centerville, UT 84014, serving Provo and the entire state of Utah. Established in 2008, the company is recognized as an EnergySage Elite Installer, the platform’s highest tier designation.
Intermountain Wind & Solar provides residential, commercial, and off-grid solar installations, along with battery storage and system maintenance. The company serves customers across the Wasatch Front and throughout Utah, with expertise in designing systems for Utah’s variable climate and elevation changes.
From their Centerville location, the company serves Utah County, Salt Lake County, Davis County, and beyond, providing solar solutions for homeowners, businesses, and remote off-grid properties.
Service Area
Intermountain Wind & Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Intermountain Wind & Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.4
490 reviews
Verified Customer
Intermountain Wind & Solar has been in the business since 2008 and the experience shows. The system design was thorough and the installation crew was highly professional.
Verified Customer
Chose IWS for their Elite Installer status on EnergySage. The commercial installation was handled expertly from permits to final inspection. System is performing above projections.
Verified Customer
Excellent off-grid system for our mountain property. The team designed a solution that handles Utah winters well with proper battery storage. Very knowledgeable crew.
Frequently Asked Questions About Intermountain Wind & Solar
What services does Intermountain Wind & Solar offer?
Intermountain Wind & Solar offers Solar Installation, Battery Storage, Maintenance.
Is Intermountain Wind & Solar NABCEP certified?
Intermountain Wind & Solar holds the following certifications: EnergySage Elite Installer. Contact them directly for the latest accreditation details.
What areas does Intermountain Wind & Solar serve?
Intermountain Wind & Solar serves Centerville, Provo, Orem, Salt Lake City, Ogden, Park City. They are based in Provo with a service radius of 100 km.
What warranty does Intermountain Wind & Solar offer?
Intermountain Wind & Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Intermountain Wind & Solar's customer reviews?
Intermountain Wind & Solar has a 4.4/5 rating based on 490 customer reviews. They are well-regarded by their customers.
How long has Intermountain Wind & Solar been in business?
Intermountain Wind & Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Provo
Get a Free Solar Quote from Intermountain Wind & Solar
Fill in your details and we'll connect you with Intermountain Wind & Solar.
Quote request sent!
Intermountain Wind & Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile