Solar Installers in Provo, Utah

10 Companies 2,935 Reviews 4.3 Avg
All ResidentialCommercialIndustrial

Top Solar Installers in Provo

Ranked by rating and customer reviews

SS
1

Spring Solar

5.0 (40 reviews)
Est. 2015 · Provo, Utah · 25yr warranty
SolarBattery
CE
2

Creative Energies

4.9 (90 reviews)
Est. 2004 · Provo, Utah · 25yr warranty
SolarBatteryEV ChargingMaintenance
RS
3

Redstone Solar

Verified
4.9 (51 reviews)
Est. 2012 · Provo, Utah · 25yr warranty
SolarBattery

NAHBGreen Certified · NARGreen Certified · USGBC LEED Green Associate

GE
4

Greenify Energy Savers

4.8 (119 reviews)
Provo, Utah · 25yr warranty
Solar
PP
5

Progressive Power Solutions

Verified
4.7 (43 reviews)
Est. 2006 · Provo, Utah · 25yr warranty
SolarBatteryMaintenance

NABCEP Certified · BBB A+

SW
6

Smart Wave Solar

Verified
4.7 (46 reviews)
Est. 2019 · Provo, Utah · 25yr warranty
SolarBattery

BBB Accredited

VE
7

Vivo Energy

4.7 (56 reviews)
Est. 2021 · Provo, Utah · 25yr warranty
Solar
BR
8

Blue Raven Solar

4.5 (2000 reviews)
Est. 2014 · Provo, Utah · 25yr warranty
SolarBattery
IW
9

Intermountain Wind & Solar

Verified
4.4 (490 reviews)
Est. 2008 · Provo, Utah · 25yr warranty
SolarBatteryMaintenance

EnergySage Elite Installer

BM
10

Bell Mountain Solar

0.0 (0 reviews)
Provo, Utah · 25yr warranty
SolarMaintenance

What Solar Costs in Provo

$2.50-$3.50

Cost per Watt

$20,000-$28,000

Typical 8kW System

8-12 yrs

Payback Period

$1,400-$2,400

Annual Savings (8kW)

Based on national averages. The 30% federal residential tax credit expired Dec 31, 2025. State and local incentives may reduce your net cost. Get quotes from multiple installers for accurate pricing.

How We Rank Solar Installers

Our rankings combine verified customer reviews, certification status, years of experience, service range, and warranty coverage into a single SurgePV Score.

Customer Reviews

We aggregate ratings from Google, Yelp, BBB, and SolarReviews.

Certifications

NABCEP certification is the US gold standard. We also check state licensing and manufacturer certifications.

Track Record

Years in business, projects completed, and warranty coverage contribute to the overall score.

Why Trust the SurgePV Directory?

Every company listed here has been independently researched and verified. We check certifications, aggregate reviews from multiple platforms, and verify that every business is actively trading. Companies cannot pay to improve their ranking.

10

Verified Companies

2,935

Customer Reviews

Solar Installation in Provo, Utah

Provo homeowners are investing in solar to reduce electricity bills and increase property value. A typical residential system generates 9,600-14,400 kWh per year, offsetting 80-100% of household electricity use depending on system size and roof orientation.

How to Choose an Installer in Provo

Start by checking NABCEP certification and Utah state contractor licensing. Get at least three written quotes that include equipment specifications, total cost, expected annual production, and warranty terms. Compare not just price, but also equipment quality, warranty length, and the company's track record in Provo.

What to Expect

The process from signing a contract to turning on your system takes 6-12 weeks. Your installer handles design, permitting, installation (1-3 days), inspection, and utility interconnection. Once the utility grants Permission to Operate (PTO), your system goes live and starts generating savings.

More Cities in Utah

Find solar installers in other Utah cities

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation: Step by Step

1

Free Consultation

Contact an installer for a free site assessment. They'll evaluate your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, costs, available state incentives, and projected returns.

3

Permitting

Your installer handles building permits, HOA approvals, and utility interconnection applications.

4

Installation

Panels, inverter, and wiring are installed in 1-3 days. Followed by city inspection.

5

Permission to Operate

Utility grants PTO, system goes live, and you start generating clean energy.

Frequently Asked Questions

How much do solar panels cost in Provo?

Solar panel costs in Provo typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. Utah state and local incentives, net metering, and SRECs may help reduce your net cost.

Who is the best solar installer in Provo?

The best solar installer in Provo depends on your needs, budget, and project type. Check ratings, reviews, certifications (NABCEP), and experience on this page. Get quotes from at least three installers to compare.

How long does solar installation take?

Physical installation takes 1-3 days. The full process from contract to Permission to Operate typically takes 6-12 weeks, including design, permitting, installation, inspection, and utility interconnection.

Do I need permits for solar panels?

Yes. Solar installations require building and electrical permits. Your installer handles all permitting, including HOA approval and utility interconnection. Some jurisdictions use SolarAPP+ for same-day automated approvals.

What solar incentives are available in Provo?

The 30% federal residential clean energy tax credit (ITC) expired on December 31, 2025. However, Utah may offer state-level incentives such as rebates, performance-based incentives, or solar renewable energy certificates (SRECs). Net metering policies vary by utility — check with your local utility in Provo to see if they offer full retail credit for exported solar power. Your installer should walk you through all available incentives during the quoting process.

How much can I save with solar panels in Provo?

Savings depend on your electricity rate, system size, and sun exposure. A typical 8kW system offsets $1,400-$2,400 per year in electricity costs. Over 25 years, total savings typically range from $25,000-$50,000. Your installer can provide a detailed savings estimate based on your specific utility rate and energy usage.

Should I get battery storage with my solar panels?

Battery storage ($12,000-$18,000 installed) is worth considering if you have time-of-use electricity rates, experience frequent power outages, or want energy independence. Without favorable net metering, batteries help you use more of your own solar power instead of exporting it at lower rates. Popular options include Tesla Powerwall, Enphase IQ Battery, and Franklin WH.

What equipment should I look for?

Top-tier solar panels include REC, Q Cells, Canadian Solar, and Silfab. For inverters, Enphase microinverters (25-year warranty) and SolarEdge optimizers are the most popular. Your installer should offer multiple equipment options at different price points and explain the trade-offs.

Are You a Solar Installer in Provo?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free