IS

Ion Solar Pros

Connecticut-founded solar installer with offices in Hartford, Middlebury, and Stamford serving the entire Northeast

Hartford, Connecticut
4.7 (120 reviews)
Verified
Residential Commercial

9+

Years in Business

2,000+

Projects Completed

120

Customer Reviews

99 mi

Service Area

51-200

Employees

SurgePV Score

8.9 / 10
Customer Reviews
94%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About Ion Solar Pros

Ion Solar Pros, commonly known as iSP, was founded in 2017 by industry veteran Bill Barrieau in Middlebury, Connecticut. The company has since expanded to three Connecticut offices, including a Hartford location at 75 Charter Oak Avenue and a Stamford office, and now serves homeowners across CT, MA, NY, RI, and the greater Northeast. iSP has designed and installed thousands of residential and commercial solar systems backed by a 25-year warranty.

The company is a member of the Connecticut Green Bank Contractor Network and holds NABCEP certification. iSP installs panels from Qcells and REC alongside Enphase microinverters and SolarEdge optimizers, and offers battery storage from Tesla and Enphase. Their team manages every aspect of the solar process, including site assessment, custom system design, permitting, installation, and utility interconnection.

Ion Solar Pros differentiates itself through its Connecticut roots and local expertise. The company understands the state’s net metering policies, utility rate structures, and permitting requirements. iSP offers multiple financing options, including $0-down loans and leases, making solar accessible to a wide range of homeowners in the Hartford area.

Service Area

Ion Solar Pros serves the following areas within a 99-mile radius:

HartfordWest HartfordNew HavenStamfordMiddleburyWaterburyNew BritainManchester

Are you Ion Solar Pros?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance
Grid Connection
Commercial Solar

Certifications & Accreditations

NABCEP CT Green Bank Contractor

Partner Manufacturers

Panels

QcellsREC

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

120 reviews

Chris B.

18 September 2025
Verified Customer

Ion Solar Pros designed a system that fit our roof perfectly and maximized production. The Hartford office team was responsive to every question and the installation was completed in one day. Seeing real savings on our electric bill already.

Angela M.

30 June 2025
Verified Customer

We chose iSP because they are headquartered right here in Connecticut. The sales process was straightforward with no pressure tactics. The crew was professional and cleaned up after themselves.

Tom W.

14 February 2025
Verified Customer

Good overall experience. The system is performing as promised and customer service has been helpful when I had monitoring questions. The only drawback was a slight delay in getting our permit approved by the city.

Frequently Asked Questions About Ion Solar Pros

What services does Ion Solar Pros offer?

Ion Solar Pros offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance, Grid Connection, Commercial Solar.

Is Ion Solar Pros NABCEP certified?

Yes, Ion Solar Pros is NABCEP certified and also holds CT Green Bank Contractor certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Ion Solar Pros serve?

Ion Solar Pros serves Hartford, West Hartford, New Haven, Stamford, Middlebury, Waterbury, New Britain, Manchester. They are based in Hartford with a service radius of 160 km.

What warranty does Ion Solar Pros offer?

Ion Solar Pros offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Ion Solar Pros's customer reviews?

Ion Solar Pros has a 4.7/5 rating based on 120 customer reviews. Customers consistently rate them highly.

How long has Ion Solar Pros been in business?

Ion Solar Pros was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Ion Solar Pros

Fill in your details and we'll connect you with Ion Solar Pros.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote