IronHead Solar
Veteran-owned Oregon solar installer offering roof and solar bundles across the Willamette Valley since 2017
9+
Years in Business
15
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About IronHead Solar
IronHead Solar is the solar division of IronHead Roofing, a veteran-owned Oregon company with an office at 751 W 7th Avenue in Eugene and primary operations in Albany. Founded in 2017, IronHead has built its reputation on integrity, craftsmanship, and innovation, earning recognition as the 2024 Innovator of the Year by the Roofing Technology Think Tank (RT3).
IronHead Solar specializes in roof and solar bundle installations, combining roofing and solar projects under a single team to maximize value and ensure proper integration. This approach protects the homeowner’s investment by having roofing experts handle the structural work alongside the solar installation. The company serves communities from Albany to Corvallis, Eugene, Salem, and across the Willamette Valley.
IronHead holds a BBB A+ rating and is both an Owens Corning Platinum Preferred Contractor and a GAF Gold Elite Commercial Contractor, distinctions earned by a small percentage of contractors nationwide. All installations are backed by a satisfaction guarantee.
Service Area
IronHead Solar serves the following areas within a 62-mile radius:
Contact Information
Are you IronHead Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
15 reviews
Derek W.
IronHead handled both our roof replacement and solar installation together. Having one team do both saved us time and money. Quality work throughout.
Janet C.
Veteran-owned company that takes pride in their work. The solar panels look great on our new roof and the system is performing well.
Todd K.
Good experience with the roof and solar bundle. The crew was professional and the project was completed on schedule. Solid warranty coverage.
Frequently Asked Questions About IronHead Solar
What services does IronHead Solar offer?
IronHead Solar offers Solar Installation, Solar Design.
Is IronHead Solar NABCEP certified?
IronHead Solar holds the following certifications: BBB A+ Rating, Owens Corning Platinum Preferred Contractor, GAF Gold Elite Commercial Contractor, Oregon Contractor License. Contact them directly for the latest accreditation details.
What areas does IronHead Solar serve?
IronHead Solar serves Eugene, Corvallis, Albany, Salem, Springfield. They are based in Eugene with a service radius of 100 km.
What warranty does IronHead Solar offer?
IronHead Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are IronHead Solar's customer reviews?
IronHead Solar has a 4.7/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has IronHead Solar been in business?
IronHead Solar was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Eugene
Get a Free Solar Quote from IronHead Solar
Fill in your details and we'll connect you with IronHead Solar.
Quote request sent!
IronHead Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile