JIT Solar
NABCEP and LEED certified Mesa solar installer specializing in SRP and APS residential and commercial systems
8+
Years in Business
30
Customer Reviews
37 mi
Service Area
1-10
Employees
SurgePV Score
About JIT Solar
JIT Solar is a solar installation company located at 1121 S Horne, Mesa, AZ 85204. Founded in 2018 with over 10 years of combined industry experience, the company serves residential and commercial clients across the Phoenix metro area.
JIT Solar holds NABCEP and LEED certifications, is BBB accredited since 2021, and is a certified SRP Preferred Installer. The company specializes in designing solar systems for SRP and APS utility customers, optimizing system size to maximize buyback credits while covering 100% of energy needs.
Services include solar panel installation, system repair and maintenance, and removal and reinstallation of solar systems. JIT Solar operates seven days a week and provides free quotes for all projects across Mesa, Scottsdale, Phoenix, Paradise Valley, Gilbert, and Chandler.
Service Area
JIT Solar serves the following areas within a 37-mile radius:
Contact Information
Are you JIT Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
30 reviews
Verified Customer
JIT Solar designed a system that covers 100% of our energy needs while maximizing our SRP buyback credits. Israel and his team were professional and thorough.
Verified Customer
Excellent experience from consultation to installation. The NABCEP certification gives confidence in the quality of work. System has been performing above expectations.
Verified Customer
Highly recommend JIT Solar. They took the time to explain how SRP credits work and designed a system tailored to our usage. Clean installation and great follow-up.
Frequently Asked Questions About JIT Solar
What services does JIT Solar offer?
JIT Solar offers Solar Installation, Maintenance, system_design.
Is JIT Solar NABCEP certified?
JIT Solar holds the following certifications: NABCEP Certified, LEED Certified, BBB Accredited, SRP Preferred Installer. Contact them directly for the latest accreditation details.
What areas does JIT Solar serve?
JIT Solar serves Mesa, Scottsdale, Phoenix, Paradise Valley, Gilbert, Chandler. They are based in Mesa with a service radius of 60 km.
What warranty does JIT Solar offer?
JIT Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are JIT Solar's customer reviews?
JIT Solar has a 4.9/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has JIT Solar been in business?
JIT Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Mesa
Get a Free Solar Quote from JIT Solar
Fill in your details and we'll connect you with JIT Solar.
Quote request sent!
JIT Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile