J

Jorro

Scotland's leading installer of solar PV, battery storage, and EV charge points

Glasgow, UK
4.9 (90 reviews)
Verified
Residential Commercial

12+

Years in Business

90

Customer Reviews

100 km

Service Area

11-50

Employees

SurgePV Score

7.6 / 10
Customer Reviews
98%
Certifications
60%
Experience
85%
Services Range
75%
Warranty Coverage
60%
Online Presence
50%

About Jorro

Jorro is a Glasgow-based renewable energy installer operating from Edinburgh Road in the east of the city. Founded in 2014, the company has spent over a decade building a reputation as one of Scotland’s most reliable installers of solar PV, battery storage, and EV charge points. They are MCS approved and certified to install Tesla Powerwall batteries, serving both residential and commercial customers across the Central Belt.

The company’s technical sales director, Steven McMahon, is frequently mentioned by name in customer reviews for his detailed system design work and honest approach to sizing installations. Jorro’s 4.9-star Trustpilot rating from 90 reviews reflects this personal, consultative approach. Customers consistently praise the accuracy of generation estimates and the quality of workmanship from their installation teams.

Jorro covers Glasgow, Edinburgh, Stirling, Falkirk, and Lanarkshire, handling both domestic rooftop systems and larger commercial installations. Their experience with workplace EV charge points alongside solar gives them a useful cross-discipline capability for businesses looking to install solar and charging infrastructure together. The company’s MCS approval means all installations qualify for the Smart Export Guarantee and 0% VAT on residential systems.

Service Area

Jorro serves the following areas within a 100 km radius:

GlasgowEdinburghStirlingFalkirkLanarkshire

Are you Jorro?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

4.9

90 reviews

Rob Walker

10 March 2026
Verified Customer

Jorro are a superb company supplying correctly planned Solar and Battery systems at a fair price.

Graham Wilson

14 January 2026
Verified Customer

Great company. Right from the start Steve designed me a system that was perfect for my house.

C Howatson

26 December 2025
Verified Customer

So pleased we chose Jorro Ltd for our solar panels and air source heat pump system installation.

Frequently Asked Questions About Jorro

What services does Jorro offer?

Jorro offers Solar Installation, Battery Storage, EV Charging.

Is Jorro MCS certified?

Yes, Jorro is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Jorro serve?

Jorro serves Glasgow, Edinburgh, Stirling, Falkirk, Lanarkshire. They are based in Glasgow with a service radius of 100 km.

What warranty does Jorro offer?

Jorro offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.

How are Jorro's customer reviews?

Jorro has a 4.9/5 rating based on 90 customer reviews. Customers consistently rate them highly.

How long has Jorro been in business?

Jorro was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Jorro

Fill in your details and we'll connect you with Jorro.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote