PR

PWS Renewables

MCS-certified solar and EV charging specialists in Glasgow's West End

Glasgow, UK
5 (500 reviews)
Verified
Residential

13+

Years in Business

500

Customer Reviews

60 km

Service Area

2-10

Employees

SurgePV Score

8.7 / 10
Customer Reviews
100%
Certifications
100%
Experience
85%
Services Range
75%
Warranty Coverage
60%
Online Presence
75%

About PWS Renewables

PWS Renewables is a Glasgow-based electrical and renewable energy company operating from Dumbarton Road in the city’s West End. Founded in 2013 with a specialisation in EV charging installations, PWS has grown into one of Glasgow’s leading solar panel installers. The company holds MCS, RECC, TrustMark, NAPIT, and SELECT approvals, and has fitted over 500 EV chargers alongside a growing portfolio of solar PV installations.

The company’s electricians are fully qualified solar specialists who handle everything from initial survey through to commissioning. PWS works with leading equipment brands including SolarEdge and Sigenergy, and installs battery storage systems alongside solar panels for homeowners looking to maximise self-consumption. Their MCS certification means customers qualify for the Smart Export Guarantee and 0% VAT on residential systems.

PWS Renewables consistently earns 5-star ratings on Google from over 500 customers, with reviewers regularly praising their professionalism, punctuality, and tidy workmanship. The company covers Glasgow and the wider West of Scotland, including Milngavie, Bearsden, Clydebank, and Paisley. Their background in electrical work gives them an edge on complex installations where existing wiring needs upgrading alongside the solar system.

Service Area

PWS Renewables serves the following areas within a 60 km radius:

GlasgowMilngavieBearsdenClydebankPaisley

Are you PWS Renewables?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

MCS RECC TrustMark NAPIT SELECT

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

10 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

5

500 reviews

Verified Customer

10 December 2025
Verified Customer

Fantastic service from the team at PWS. Exceptional work and I would strongly recommend them to anyone looking for solar panels in Glasgow.

Verified Customer

20 September 2025
Verified Customer

Highly recommended. Professional, punctual, and the installation was carried out to a very high standard. Communication throughout was excellent.

Frequently Asked Questions About PWS Renewables

What services does PWS Renewables offer?

PWS Renewables offers Solar Installation, Battery Storage, EV Charging.

Is PWS Renewables MCS certified?

Yes, PWS Renewables is MCS certified and also holds RECC, TrustMark, NAPIT, SELECT certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does PWS Renewables serve?

PWS Renewables serves Glasgow, Milngavie, Bearsden, Clydebank, Paisley. They are based in Glasgow with a service radius of 60 km.

What warranty does PWS Renewables offer?

PWS Renewables offers 25-year panel warranty, 10-year inverter warranty, and 10-year installation/workmanship warranty.

How are PWS Renewables's customer reviews?

PWS Renewables has a 5/5 rating based on 500 customer reviews. Customers consistently rate them highly.

How long has PWS Renewables been in business?

PWS Renewables was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from PWS Renewables

Fill in your details and we'll connect you with PWS Renewables.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote