Lincoln Electrical
MCS accredited solar panel installation and maintenance specialists with 15+ years experience in Lincoln and Lincolnshire
2026+
Years in Business
139
Customer Reviews
50 km
Service Area
11-50
Employees
SurgePV Score
About Lincoln Electrical
Lincoln Electrical is an MCS accredited solar panel installation and electrical company based in the LN6 postcode area of Lincoln. The company can be reached on 01522 776275 or by email at [email protected]. With over 15 years of experience implementing solar panel systems across a range of residential, commercial, and public sector properties, Lincoln Electrical is one of the most established solar installers in Lincolnshire.
Services include solar panel design, installation, and maintenance across the Lincoln and wider Lincolnshire area. Lincoln Electrical is MCS accredited, meaning all installations comply with the Microgeneration Certification Scheme’s quality standards and customers can access Smart Export Guarantee payments.
Customer feedback consistently highlights the professionalism and punctuality of the team. Reviewers describe the staff as polite, knowledgeable, and trustworthy, with multiple customers having returned to the company for separate projects over several years. Lincoln Electrical’s long track record in the county makes it a reliable choice for homeowners and businesses seeking an established local installer rather than a national operator.
Service Area
Lincoln Electrical serves the following areas within a 50 km radius:
Contact Information
Are you Lincoln Electrical?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.9
139 reviews
Verified Customer
All staff were polite, professional and kept us informed of progress throughout. Highly recommend Lincoln Electrical.
Verified Customer
We have used Lincoln Electrical over several years for big and small jobs. They are very knowledgeable, punctual, trustworthy and friendly.
Frequently Asked Questions About Lincoln Electrical
What services does Lincoln Electrical offer?
Lincoln Electrical offers Solar Installation, Battery Storage, Maintenance.
Is Lincoln Electrical MCS certified?
Yes, Lincoln Electrical is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Lincoln Electrical serve?
Lincoln Electrical serves Lincoln, Sleaford, Newark, Gainsborough, Grantham. They are based in Lincoln with a service radius of 50 km.
What warranty does Lincoln Electrical offer?
Lincoln Electrical offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Lincoln Electrical's customer reviews?
Lincoln Electrical has a 4.9/5 rating based on 139 customer reviews. Customers consistently rate them highly.
How long has Lincoln Electrical been in business?
Lincoln Electrical was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Lincoln
Get a Free Solar Quote from Lincoln Electrical
Fill in your details and we'll connect you with Lincoln Electrical.
Quote request sent!
Lincoln Electrical will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile